Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27331
Well Classification: GW Status: PA - 11/1/2024
Well Name/No:FRICO #36-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/1/2024
FacilityID:287008LocationID:332588
County:WELD #123Location:SWSW 15 3N65W 6
Field:WATTENBERG - #90750Elevation:4810 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:457FSL  1155 FWLLat/Long: 40.219390 / -104.655522Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.219420 / -104.655230Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/1/2024             Measured TD: 8008 ft.    Vertical TD: 7716 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/1/2024
Wellbore PermitDIRECTIONAL
Permit #:20092774 Expiration Date:7/22/2011
Proposed Top PZ Location:Sec: Twp: Footage: 80 FSL  2600 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65W Footage: 101 FSL  2547 FEL
Proposed Depth/Form:8008 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 318 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 771 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 490, Top: 0 ft., Bottom: 771 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7992 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 705, Top: 2894 ft., Bottom: 7992 ft.

Wellbore Completed
Completion Date:9/26/2007
Spud Date:9/20/2007Spud Date Is:ACTUAL
Measured TD:8008 ft.Measured PB depth:7958 ft.
True Vertical TD:7716 ft.True Vertical PB depth:7666 ft.
Top PZ Location:Sec: Twp: Footage: 80 FSL  2600 FEL
Bottom Hole Location:Sec:15 Twp: 3N 65WFootage: 101 FSL  2547 FEL
Log Types:CBL, P/E AILC-CDLD-ML, MUD
Log Types:CBL, P/E AILC-CNLD-ML, MUD
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 773 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 490, Top: 0 ft., Bottom: 773 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7992 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 700, Top: 2882 ft., Bottom: 7992 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3928 ft.NN
SUSSEX4380 ft.NN
NIOBRARA7184 ft.NN
FORT HAYS7372 ft.NN
CODELL7396 ft.NN
J SAND7836 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/1/2024                 Interval Top: 7836 ft.    Interval Bottom: 7896 ft.

 Completed Information for Formation J SAND
1st Production Date:4/8/2010Choke Size:0.406 in.
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/24/2010
Treatment Summary:FRAC W/164149 GAL SW W/115060# 40/70 & 4000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7792 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/22/2010Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1252
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 7750
CALC_MCF_GAS 62
CASING_PRESS 704
GRAVITY_OIL 58
TUBING_PRESS 392
Perforation Data:
Interval Top:7836 ft.# Of Holes:60
Interval Bottom:7896 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/22/2010                 Interval Top: 7396 ft.    Interval Bottom: 7414 ft.

 Completed Information for Formation CODELL
1st Production Date:10/29/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2007
Treatment Summary:170,319 GALS FLUID & 107,960 LBS 30/50 SAND AND 4000 LBS RESIN COATED SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7396 ft.# Of Holes:54
Interval Bottom:7414 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/1/2024                 Interval Top: 7206 ft.    Interval Bottom: 7414 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/29/2007Choke Size:0.406 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2010
Treatment Summary:NB PERF 7206-7308 HOLES 60 SIZE 0.42. CD PERF 7396-7414 HOLES 54 SIZE 0.38. NO ADDITIONAL TREATMENT
Tubing Size:2.375 in.Tubing Setting Depth:7792 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/22/2010Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BTU_GAS 1252
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 7750
CALC_MCF_GAS 62
CASING_PRESS 704
GRAVITY_OIL 58
TUBING_PRESS 392
Perforation Data:
Interval Top:7206 ft.# Of Holes:114
Interval Bottom:7414 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/22/2010                 Interval Top: 7206 ft.    Interval Bottom: 7308 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/29/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/9/2007
Treatment Summary:249,336 GAL S/WATER FLUID & 196,120 LBS 30/50 SAND AND 4996 LBS RESIN COATED SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7206 ft.# Of Holes:60
Interval Bottom:7308 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/01/2024
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No