|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2024 Measured TD: 7515 ft. Vertical TD: 7413 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20082620 | Expiration Date: | 8/4/2009 | | Proposed Top PZ Location: | Sec:4 Twp: 4N 66W | Footage: 2715 FNL 1291 FEL | | Bottom Hole Location: | Sec:4 Twp: 4N 66W | Footage: 2715 FNL 1291 FEL | | Proposed Depth/Form: | 7474 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 2/8/2009 | | Spud Date: | 2/2/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7515 ft. | Measured PB depth: | 7479 ft. | | True Vertical TD: | 7413 ft. | True Vertical PB depth: | 7376 ft. | | Top PZ Location: | Sec:4 Twp: 4N 66W | Footage: 2715 FNL 1291 FEL | | Bottom Hole Location: | Sec:4 Twp: 4N 66W | Footage: 2715 FNL 1291 FEL | | Log Types: | DIL, CDL, CNL, GR, SP, CAL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 416 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 416 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 4.5 in., Top: 0 ft., Depth: 7515 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 645, Top: 2340 ft., Bottom: 7515 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1294 ft. | | N | N | | PARKMAN | 3664 ft. | | N | N | | SUSSEX | 4353 ft. | | N | N | | SHANNON | 4804 ft. | | N | N | | NIOBRARA | 6956 ft. | | N | N | | FORT HAYS | 7257 ft. | | N | N | | CODELL | 7279 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 7280 ft. Interval Bottom: 7290 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/15/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2009 | | Treatment Summary: | FRAC'D WITH 143,892 GAS 26# SILVERSTIM HYBRID CROSSED-LINKED GEL CONTAINING 270,300# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7280 ft. | # Of Holes: | 40 | | Interval Bottom: | 7290 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: SI - 9/1/2024 Interval Top: 6972 ft. Interval Bottom: 7290 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/15/2009 | Choke Size: | 0.563 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/2/2009 | | Treatment Summary: | SEE INDIVIDUAL FORMATIONS BELOW |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/5/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 2 | | BBLS_OIL | 8 | | BTU_GAS | 1252 | | CALC_BBLS_H2O | 8 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 28750 | | CALC_MCF_GAS | 230 | | CASING_PRESS | 660 | | GRAVITY_OIL | 60 | | MCF_GAS | 230 |
| | Perforation Data: | | Interval Top: | 6972 ft. | # Of Holes: | 88 | | Interval Bottom: | 7290 ft. | Hole Size: | 0.41 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 10/12/2011 Interval Top: 6972 ft. Interval Bottom: 7096 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 4/15/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/3/2009 | | Treatment Summary: | FRAC'D WITH 70,000 GAL SLICK WATER AND 101,85O GAL 20# TO 18# SILVERSTIM HYBRID CROSS-LINKED GEL CONTAINING 238,000# 20/40 SAND AND 10.000 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6972 ft. | # Of Holes: | 40 | | Interval Bottom: | 7096 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 12/30/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 08/31/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|