Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27145
Well Classification: GW Status: PA - 4/24/2018
Well Name/No:CARMA #33-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/24/2018
FacilityID:297446LocationID:336062
Municipality/County:FIRESTONE / WELD #123Location:NWSW 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4900 ft.
Planned Location:1638FSL  1183 FWLLat/Long: 40.194350 / -104.956410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.194341 / -104.956399Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 8/17/2017             Measured TD: 7600 ft.    Vertical TD: 7432 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 8/17/2017
Wellbore PermitDIRECTIONAL
Permit #:20083236 Expiration Date:7/29/2009
Proposed Top PZ Location:Sec: Twp: Footage: 1320 FSL  50 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68W Footage: 1320 FSL  50 FWL
Proposed Depth/Form:7556 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: GWA

Wellbore Completed
Completion Date:9/9/2008
Spud Date:9/5/2008Spud Date Is:ACTUAL
Measured TD:7600 ft.Measured PB depth:7551 ft.
True Vertical TD:7432 ft.True Vertical PB depth:7383 ft.
Top PZ Location:Sec:25 Twp: 3N 68WFootage: 1317 FSL  53 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68WFootage: 1317 FSL  53 FWL
Log Types:CBL, CDL/CNL/ML, DIL/GL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 913 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 913 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7567 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 675, Top: 3370 ft., Bottom: 7567 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3770 ft.NN
SUSSEX4238 ft.NN
SHANNON4782 ft.NN
NIOBRARA7152 ft.NN
FORT HAYS7396 ft.NN
CODELL7417 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/23/2008                Interval Top: 7418 ft.    Interval Bottom: 7438 ft.

 Completed Information for Formation CODELL
1st Production Date:9/30/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2008
Treatment Summary:8,030 GALS FE-1A PAD & 122,906 GALS FRAC GEL & 220,400 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7418 ft.# Of Holes:60
Interval Bottom:7438 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 4/24/2018                 Interval Top: 7165 ft.    Interval Bottom: 7438 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/9/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1212
CALC_BBLS_H2O 0
CALC_BBLS_OIL 3
CALC_GOR 33000
CALC_MCF_GAS 99
CASING_PRESS 1600
GRAVITY_OIL 51
Perforation Data:
Interval Top:7165 ft.# Of Holes:120
Interval Bottom:7438 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/23/2008                Interval Top: 7165 ft.    Interval Bottom: 7294 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/30/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/22/2008
Treatment Summary:1,000 GALS ACID & 7,070 GALS FE-1A PAD & 62,700 GALS FLUID & 104,755 GALS GEL & 250,040 LBS 30/50 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7165 ft.# Of Holes:60
Interval Bottom:7294 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/24/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No