Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27141
Well Classification: OW Status: PA - 7/1/2019
Well Name/No:RADEMACHER #23-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/1/2019
FacilityID:297447LocationID:336065
Municipality/County:FIRESTONE / WELD #123Location:SWSE 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1314FSL  1545 FELLat/Long: 40.193560 / -104.947300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.193547 / -104.947294Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/1/2019             Measured TD: 7615 ft.    Vertical TD: 7418 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/1/2019
Wellbore PermitDIRECTIONAL
Permit #:20083141 Expiration Date:7/29/2009
Proposed Top PZ Location:Sec:25 Twp: 3N 68W Footage: 1320 FSL  2552 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68W Footage: 1318 FSL  2554 FWL
Proposed Depth/Form:7513 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:N/A
Spud Date:8/6/2008Spud Date Is:ACTUAL
Measured TD:7615 ft.Measured PB depth:7581 ft.
True Vertical TD:7418 ft.True Vertical PB depth:7384 ft.
Top PZ Location:Sec:25 Twp: 3N 68WFootage: 1320 FSL  2552 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68WFootage: 1318 FSL  2554 FWL
Log Types:CBL, AILC, CNLD, ML
Log Types:CBL, P/E AILC-CNLD-ML
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 909 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 909 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7605 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 2820 ft., Bottom: 7605 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 834 ft., Bottom: 1512 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 833 ft., Depth: 1500 ft., Bottom: 1513 ft., Sacks: 130, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN3780 ft.4000 ft.
SUSSEX4243 ft.4420 ft.
SHANNON4800 ft.4830 ft.
NIOBRARA7138 ft.
FORT HAYS7376 ft.
CODELL7398 ft.7419 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/28/2010                 Interval Top: 7398 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation CODELL
1st Production Date:10/16/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2008
Treatment Summary:130,632 GALS FLUID & 220,000 LBS 20/40 SAND & 4000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7398 ft.# Of Holes:54
Interval Bottom:7416 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/1/2019                  Interval Top: 7138 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/16/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/16/2008
Treatment Summary:
Formation Treatment
Treatment Date:9/8/2008
Treatment Summary:NBRR PERF 7138-7272 HOLES 114 SIZE 0.42 CODL PERF 7398-7416 HOLES 54 SIZE 0.38 FRAC NBRR W/331,178 GAL SW & 253,000# 40/70 SAND & 8,000# 20/40 SB EXCEL. FRAC CODL W/130,632 GAL SILVERSTIM GEL & 220,000# 20/40 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7360 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1174
CALC_BBLS_H2O 0
CALC_BBLS_OIL 28
CALC_GOR 3036
CALC_MCF_GAS 85
CASING_PRESS 1280
GRAVITY_OIL 1273
TUBING_PRESS 1080
Perforation Data:
Interval Top:7138 ft.# Of Holes:158
Interval Bottom:7416 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/28/2010                 Interval Top: 7138 ft.    Interval Bottom: 7272 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/16/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2008
Treatment Summary:331,178 GALS FLUID & 253,000 LBS 40/70 SAND & 8000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7138 ft.# Of Holes:104
Interval Bottom:7272 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/01/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No