Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27141
Well Classification: OW Status: PA - 7/1/2019
Well Name/No:RADEMACHER #23-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/1/2019
FacilityID:297447LocationID:336065
Municipality/County:FIRESTONE / WELD #123Location:SWSE 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4870 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1314FSL  1545 FELLat/Long: 40.193560 / -104.947300Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.193547 / -104.947294Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/1/2019             Measured TD: 7615 ft.    Vertical TD: 7418 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/1/2019
Wellbore PermitDIRECTIONAL
Permit #:20083141 Expiration Date:7/29/2009
Proposed Top PZ Location:Sec:25 Twp: 3N 68W Footage: 1320 FSL  2552 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68W Footage: 1318 FSL  2554 FWL
Proposed Depth/Form:7513 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:N/A
Spud Date:8/6/2008Spud Date Is:ACTUAL
Measured TD:7615 ft.Measured PB depth:7581 ft.
True Vertical TD:7418 ft.True Vertical PB depth:7384 ft.
Top PZ Location:Sec:25 Twp: 3N 68WFootage: 1320 FSL  2552 FWL
Bottom Hole Location:Sec:25 Twp: 3N 68WFootage: 1318 FSL  2554 FWL
Log Types:CBL, AILC, CNLD, ML
Log Types:CBL, P/E AILC-CNLD-ML
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 909 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 909 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7605 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 630, Top: 2820 ft., Bottom: 7605 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1500 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 834 ft., Bottom: 1512 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 833 ft., Depth: 1500 ft., Bottom: 1513 ft., Sacks: 130, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN3780 ft.4000 ft.
SUSSEX4243 ft.4420 ft.
SHANNON4800 ft.4830 ft.
NIOBRARA7138 ft.
FORT HAYS7376 ft.
CODELL7398 ft.7419 ft.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 5/28/2010                 Interval Top: 7398 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation CODELL
1st Production Date:10/16/2008Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2008
Treatment Summary:130,632 GALS FLUID & 220,000 LBS 20/40 SAND & 4000 LBS 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7398 ft.# Of Holes:54
Interval Bottom:7416 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 7/1/2019                  Interval Top: 7138 ft.    Interval Bottom: 7416 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/16/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/16/2008
Treatment Summary:
Formation Treatment
Treatment Date:9/8/2008
Treatment Summary:NBRR PERF 7138-7272 HOLES 114 SIZE 0.42 CODL PERF 7398-7416 HOLES 54 SIZE 0.38 FRAC NBRR W/331,178 GAL SW & 253,000# 40/70 SAND & 8,000# 20/40 SB EXCEL. FRAC CODL W/130,632 GAL SILVERSTIM GEL & 220,000# 20/40 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:2.375 in.Tubing Setting Depth:7360 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/1/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1174
CALC_BBLS_H2O 0
CALC_BBLS_OIL 28
CALC_GOR 3036
CALC_MCF_GAS 85
CASING_PRESS 1280
GRAVITY_OIL 1273
TUBING_PRESS 1080
Perforation Data:
Interval Top:7138 ft.# Of Holes:158
Interval Bottom:7416 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 5/28/2010                 Interval Top: 7138 ft.    Interval Bottom: 7272 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/16/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/8/2008
Treatment Summary:331,178 GALS FLUID & 253,000 LBS 40/70 SAND & 8000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7138 ft.# Of Holes:104
Interval Bottom:7272 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/01/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No