|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/7/2021 Measured TD: 7647 ft. Vertical TD: 7470 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/7/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20083423 | Expiration Date: | 7/29/2009 | | Proposed Top PZ Location: | Sec:25 Twp: 3N 68W | Footage: 31 FSL 1570 FEL | | Bottom Hole Location: | Sec:25 Twp: 3N 68W | Footage: 31 FSL 1570 FEL | | Proposed Depth/Form: | 7579 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 8/17/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7647 ft. | Measured PB depth: | 7607 ft. | | True Vertical TD: | 7470 ft. | True Vertical PB depth: | 7430 ft. | | Top PZ Location: | Sec:25 Twp: 3N 68W | Footage: 31 FSL 1570 FEL | | Bottom Hole Location: | Sec:25 Twp: 3N 68W | Footage: 31 FSL 1570 FEL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 907 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7637 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 677, Top: 2630 ft., Bottom: 7637 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1526 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 727 ft., Bottom: 1526 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3770 ft. | | N | N | | SUSSEX | 4248 ft. | | N | N | | SHANNON | 4792 ft. | | N | N | | NIOBRARA | 7265 ft. | | N | N | | FORT HAYS | 7450 ft. | | N | N | | CODELL | 7470 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/12/2008 Interval Top: 7468 ft. Interval Bottom: 7483 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/16/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2008 | | Treatment Summary: | 131746 GALS FLUID & 221360 LBS 20/40 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7468 ft. | # Of Holes: | 60 | | Interval Bottom: | 7483 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/7/2021 Interval Top: 7284 ft. Interval Bottom: 7483 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 10/16/2008 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/22/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/12/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1154 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 3000 | | CALC_MCF_GAS | 81 | | CASING_PRESS | 1350 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7284 ft. | # Of Holes: | 132 | | Interval Bottom: | 7483 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/12/2008 Interval Top: 7284 ft. Interval Bottom: 7417 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/16/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/17/2008 | | Treatment Summary: | 1000 GALS ACID & 65140 GALS FLUID & 103074 GALS GEL & 250540 LBS 20/40 SAND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7284 ft. | # Of Holes: | 72 | | Interval Bottom: | 7417 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/07/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|