Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27109
Well Classification: OW Status: TA - 3/11/2021
Well Name/No:STROH #12-22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date3/11/2021
FacilityID:297386LocationID:310848
County:WELD #123Location:SWNW 22 4N67W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1919FNL  716 FWLLat/Long: 40.300060 / -104.883790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.300060 / -104.883790Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 3/11/2021             Measured TD: 7478 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 3/11/2021
Wellbore Permit
Permit #: Expiration Date:5/19/2012
Proposed Depth/Form:7430 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2-NW/4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: S/2-NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 640 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 300, Top: , Bottom: 640 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7430 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 275, Top: 6600 ft., Bottom: 7430 ft.

Wellbore Completed
Completion Date:10/3/2010
Spud Date:9/27/2010Spud Date Is:ACTUAL
Measured TD:7478 ft.Measured PB depth:7406 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR, FDC, CNL, DIL, CBL,
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 654 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 654 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7385 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 655, Top: 2680 ft., Bottom: 7385 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3605 ft.3882 ft.NN
SUSSEX4205 ft.4394 ft.NN
SHANNON4643 ft.4719 ft.NN
NIOBRARA6932 ft.7223 ft.NN
FORT HAYS7223 ft.7246 ft.NN
CODELL7246 ft.7268 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/10/2011                Interval Top: 7247 ft.    Interval Bottom: 7257 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/20/2010
Treatment Summary:Frac'd 7247'-7257' w 125,000 gal frac fluid and 250,160# 30/50 sand.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7247 ft.# Of Holes:40
Interval Bottom:7257 ft.Hole Size:0.04 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 3/11/2021                 Interval Top: 7110 ft.    Interval Bottom: 7257 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/22/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 27
BBLS_OIL 84
BTU_GAS 1100
CALC_BBLS_H2O 27
CALC_BBLS_OIL 84
CALC_GOR 2440
CALC_MCF_GAS 205
CASING_PRESS 2100
GRAVITY_OIL 33
MCF_GAS 205
Perforation Data:
Interval Top:7110 ft.# Of Holes:140
Interval Bottom:7257 ft.Hole Size:0.04 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/10/2011                Interval Top: 6952 ft.    Interval Bottom: 7136 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6952 ft.# Of Holes:100
Interval Bottom:7136 ft.Hole Size:0.04 in.
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
12/06/2022
Defined Inactive (TA)YLast Production
10/31/2019
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No