Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27105
Well Classification: GW Status: PA - 11/18/2025
Well Name/No:CENTEX #40-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/18/2025
FacilityID:297382LocationID:336527
Municipality/County:FREDERICK / WELD #123Location:NESE 25 2N68W 6
Field:SPINDLE - #77900Elevation:4968 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1787FSL  812 FELLat/Long: 40.107144 / -104.945047Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.107155 / -104.945067Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2011
End Date: 6/23/2011
Reported: 8/22/2011
Prior to rule 205A.b.(2)(A)
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/18/2025             Measured TD: 8320 ft.    Vertical TD: 8177 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/18/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/26/2012
Proposed Top PZ Location:Sec:25 Twp: 2N 68W Footage: 2566 FSL  60 FEL
Bottom Hole Location:Sec:25 Twp: 2N 68W Footage: 2567 FSL  59 FEL
Proposed Depth/Form:8320 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 905 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 0 ft., Bottom: 905 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8311 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 835, Top: 4110 ft., Bottom: 8311 ft.

Wellbore Completed
Completion Date:8/30/2008
Spud Date:8/24/2008Spud Date Is:ACTUAL
Measured TD:8320 ft.Measured PB depth:8281 ft.
True Vertical TD:8177 ft.True Vertical PB depth:8138 ft.
Top PZ Location:Sec:25 Twp: 2N 68WFootage: 2566 FSL  60 FEL
Bottom Hole Location:Sec:25 Twp: 2N 68WFootage: 2566 FSL  60 FEL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8311 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 4110 ft., Bottom: 8311 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4094 ft.4295 ft.NN
SUSSEX4620 ft.4692 ft.NN
SHANNON5088 ft.5130 ft.NN
NIOBRARA7428 ft.7698 ft.NN
FORT HAYS7700 ft.7720 ft.NN
CODELL7720 ft.7740 ft.NN
J SAND8140 ft.8243 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/18/2025                Interval Top: 8164 ft.    Interval Bottom: 8186 ft.

 Completed Information for Formation J SAND
1st Production Date:7/26/2011Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 163,128 gal Slickwater w/ 159,080# 30/50, 4,000# SuperLC, 0# .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8164 ft.# Of Holes:66
Interval Bottom:8186 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 7/15/2025                 Interval Top: 7723 ft.    Interval Bottom: 7743 ft.

 Completed Information for Formation CODELL
1st Production Date:12/31/2008Choke Size: 
Formation Name:CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/11/2008
Treatment Summary:168,359 GALS FLUID & 115,731# 40/70 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7723 ft.# Of Holes:60
Interval Bottom:7743 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 7/15/2025                 Interval Top: 7509 ft.    Interval Bottom: 8186 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/26/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:JSND REC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1243
CALC_BBLS_OIL 3
CALC_GOR 4000
CALC_MCF_GAS 12
CASING_PRESS 805
GRAVITY_OIL 50
MCF_GAS 12
TUBING_PRESS 754
Perforation Data:
Interval Top:7509 ft.# Of Holes:126
Interval Bottom:8186 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/18/2025                Interval Top: 7509 ft.    Interval Bottom: 7743 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/31/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/30/2008
Treatment Summary:COMMINGLE NIO/COD
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1208
CALC_BBLS_H2O 0
CALC_BBLS_OIL 59
CALC_GOR 2580
CALC_MCF_GAS 152
CASING_PRESS 600
GRAVITY_OIL 51
Perforation Data:
Interval Top:7509 ft.# Of Holes:120
Interval Bottom:7743 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 7/15/2025                 Interval Top: 7509 ft.    Interval Bottom: 7594 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/31/2008Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/26/2008
Treatment Summary:165,082 GALS FLUID & 263,840# 30/50 SAND; & 8,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7509 ft.# Of Holes:60
Interval Bottom:7594 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/18/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
11/19/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No