|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: TA - 7/15/2025 Measured TD: 8320 ft. Vertical TD: 8177 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW TA - 7/15/2025 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/26/2012 | Proposed Top PZ Location: | Sec:25 Twp: 2N 68W | Footage: 2566 FSL 60 FEL | Bottom Hole Location: | Sec:25 Twp: 2N 68W | Footage: 2567 FSL 59 FEL | Proposed Depth/Form: | 8320 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 905 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 570, Top: 0 ft., Bottom: 905 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8311 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 835, Top: 4110 ft., Bottom: 8311 ft. |
| | |
Wellbore Completed | Completion Date: | 8/30/2008 | Spud Date: | 8/24/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8320 ft. | Measured PB depth: | 8281 ft. | True Vertical TD: | 8177 ft. | True Vertical PB depth: | 8138 ft. | Top PZ Location: | Sec:25 Twp: 2N 68W | Footage: 2566 FSL 60 FEL | Bottom Hole Location: | Sec:25 Twp: 2N 68W | Footage: 2566 FSL 60 FEL | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8311 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 835, Top: 4110 ft., Bottom: 8311 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4094 ft. | 4295 ft. | N | N | SUSSEX | 4620 ft. | 4692 ft. | N | N | SHANNON | 5088 ft. | 5130 ft. | N | N | NIOBRARA | 7428 ft. | 7698 ft. | N | N | FORT HAYS | 7700 ft. | 7720 ft. | N | N | CODELL | 7720 ft. | 7740 ft. | N | N | J SAND | 8140 ft. | 8243 ft. | N | N |
Formation JSND Formation Classification: GW Status: TA - 7/15/2025 Interval Top: 8164 ft. Interval Bottom: 8186 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/26/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/23/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 163,128 gal Slickwater w/ 159,080# 30/50, 4,000# SuperLC, 0# . |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8164 ft. | # Of Holes: | 66 | Interval Bottom: | 8186 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 7/15/2025 Interval Top: 7723 ft. Interval Bottom: 7743 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/31/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/11/2008 | Treatment Summary: | 168,359 GALS FLUID & 115,731# 40/70 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7723 ft. | # Of Holes: | 60 | Interval Bottom: | 7743 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 7/15/2025 Interval Top: 7509 ft. Interval Bottom: 8186 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 7/26/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 6/23/2011 | Treatment Summary: | JSND REC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 3 | BTU_GAS | 1243 | CALC_BBLS_OIL | 3 | CALC_GOR | 4000 | CALC_MCF_GAS | 12 | CASING_PRESS | 805 | GRAVITY_OIL | 50 | MCF_GAS | 12 | TUBING_PRESS | 754 |
| Perforation Data: | Interval Top: | 7509 ft. | # Of Holes: | 126 | Interval Bottom: | 8186 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: TA - 7/15/2025 Interval Top: 7509 ft. Interval Bottom: 7743 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/31/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 8/30/2008 | Treatment Summary: | COMMINGLE NIO/COD |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1208 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 59 | CALC_GOR | 2580 | CALC_MCF_GAS | 152 | CASING_PRESS | 600 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7509 ft. | # Of Holes: | 120 | Interval Bottom: | 7743 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/15/2025 Interval Top: 7509 ft. Interval Bottom: 7594 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/31/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/26/2008 | Treatment Summary: | 165,082 GALS FLUID & 263,840# 30/50 SAND; & 8,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7509 ft. | # Of Holes: | 60 | Interval Bottom: | 7594 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 11/19/2028 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive (TA ) | Y | Defined Inactive 12/23/2024 |
Low Producing | Y | Production Period 06/2024 - 05/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 44 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.019 |
Average MCFE per Day | 0.120 |
Federal Financial Assurance | i | |
|
|