Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27094
Well Classification: OW Status: PA - 7/28/2022
Well Name/No:CARMA #12-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/28/2022
FacilityID:297369LocationID:336062
Municipality/County:FIRESTONE / WELD #123Location:NWSW 25 3N68W 6
Field:WATTENBERG - #90750Elevation:4900 ft.
Planned Location:1668FSL  1182 FWLLat/Long: 40.194440 / -104.956420Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.194421 / -104.956395Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/14/2022             Measured TD: 7505 ft.    Vertical TD: 7442 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/14/2022
Wellbore PermitDIRECTIONAL
Permit #:20082951 Expiration Date:7/23/2009
Proposed Top PZ Location:Sec:25 Twp: 3N 98W Footage: 2100 FSL  653 FWL
Bottom Hole Location:Sec:25 Twp: 3N 98W Footage: 2100 FSL  653 FWL
Proposed Depth/Form:7453 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2SW/4

Wellbore Completed
Completion Date:9/5/2004
Spud Date:8/31/2008Spud Date Is:ACTUAL
Measured TD:7505 ft.Measured PB depth:7467 ft.
True Vertical TD:7442 ft.True Vertical PB depth:7404 ft.
Top PZ Location:Sec:25 Twp: 3N 98WFootage: 2100 FSL  653 FWL
Bottom Hole Location:Sec:25 Twp: 3N 98WFootage: 2100 FSL  653 FWL
Log Types:CBL, DIL, CD/CN/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 913 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 913 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7497 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 2505 ft., Bottom: 7497 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3703 ft.NN
SUSSEX4163 ft.NN
SHANNON4662 ft.NN
NIOBRARA7042 ft.NN
FORT HAYS7285 ft.NN
CODELL7305 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/13/2008                Interval Top: 7305 ft.    Interval Bottom: 7328 ft.

 Completed Information for Formation CODELL
1st Production Date:10/30/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/2008
Treatment Summary:135,363 GALS FLUID & 218,259# 30/50 SAND, & 4,000# 20/40 R/C SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7305 ft.# Of Holes:69
Interval Bottom:7328 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/28/2022                 Interval Top: 7055 ft.    Interval Bottom: 7328 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/3/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2004
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1259
CALC_BBLS_H2O 0
CALC_BBLS_OIL 69
CALC_GOR 4812
CALC_MCF_GAS 332
CASING_PRESS 1700
GRAVITY_OIL 51
Perforation Data:
Interval Top:7055 ft.# Of Holes:127
Interval Bottom:7328 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 10/13/2008                Interval Top: 7055 ft.    Interval Bottom: 7168 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/3/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/19/2008
Treatment Summary:172,997 GALS FLUID & 245,102# 30/50 SAND & 4,000# 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7055 ft.# Of Holes:58
Interval Bottom:7168 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/28/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No