|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/25/2017 Measured TD: 8530 ft. Vertical TD: 7930 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/25/2017 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 7/21/2012 | Proposed Top PZ Location: | Sec:3 Twp: 2N 68W | Footage: 1885 FNL 639 FEL | Bottom Hole Location: | Sec:3 Twp: 2N 68W | Footage: 1885 FNL 639 FEL | Proposed Depth/Form: | 8530 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NE/4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 909 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 570, Top: 15 ft., Bottom: 909 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8517 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 325, Top: 3448 ft., Bottom: 8517 ft. |
| | |
Wellbore Completed | Completion Date: | 9/26/2008 | Spud Date: | 9/19/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8530 ft. | Measured PB depth: | 8486 ft. | True Vertical TD: | 7930 ft. | True Vertical PB depth: | 7886 ft. | Top PZ Location: | Sec:3 Twp: 2N 68W | Footage: 1885 FNL 639 FEL | Bottom Hole Location: | Sec:3 Twp: 2N 68W | Footage: 1885 FNL 639 FEL | Log Types: | CBL, P/E AILC-CNLD-ML | Casing: | String Type: CONDUCTOR, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 907 ft., Determination Method: CALC | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 570, Top: 0 ft., Bottom: 907 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 6.125 in., Size: 4.5 in., Top: , Depth: 8517 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 3340 ft., Bottom: 8517 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3848 ft. | | N | N | SUSSEX | 4385 ft. | | N | N | SHANNON | 4839 ft. | | N | N | NIOBRARA | 7686 ft. | | N | N | FORT HAYS | 7884 ft. | | N | N | CODELL | 7906 ft. | | N | N | J SAND | 8348 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 2/7/2014 Interval Top: 7906 ft. Interval Bottom: 7926 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/11/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 10/14/2013 | Treatment End Date: | 10/14/2013 | Treatment Summary: | CODELL REFRAC
4635 BBL FR WATER, 4635 BBL TOTAL FLUID.
138000# 40/70 SAND, 4000# 20/40 SAND, 142000# TOTAL SAND. | Total fluid used in treatment (bbls): | 4635 | Max pressure during treatment (psi): | 5649 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.91 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 0 | Fresh water used in treatment (bbls): | 4635 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 142000 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 10/13/2008 | Treatment Summary: | 168, 556 GALS FLUID & 115,580 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7906 ft. | # Of Holes: | 60 | Interval Bottom: | 7926 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/25/2017 Interval Top: 7690 ft. Interval Bottom: 7926 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/11/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/26/2008 | Treatment Summary: | COMMINGLED NIO AND COD |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7880 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/12/2014 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 26 | BTU_GAS | 1311 | CALC_BBLS_OIL | 26 | CALC_GOR | 3385 | CALC_MCF_GAS | 88 | CASING_PRESS | 1127 | GRAVITY_OIL | 53 | MCF_GAS | 88 | TUBING_PRESS | 914 |
| Perforation Data: | Interval Top: | 7690 ft. | # Of Holes: | 120 | Interval Bottom: | 7926 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/17/2010 Interval Top: 7690 ft. Interval Bottom: 7782 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/11/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/15/2008 | Treatment Summary: | 1000 GALS ACID & 248,088 GALS FLUID & 200,500 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7690 ft. | # Of Holes: | 60 | Interval Bottom: | 7782 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 07/25/2017 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|