Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27077
Well Classification: GW Status: PA - 3/17/2025
Well Name/No:CENTEX #16-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date3/17/2025
FacilityID:297343LocationID:336527
Municipality/County:FREDERICK / WELD #123Location:NESE 25 2N68W 6
Field:SPINDLE - #77900Elevation:4968 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1778FSL  798 FELLat/Long: 40.107144 / -104.945003Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.107134 / -104.945017Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/23/2011
End Date: 6/23/2011
Reported: 8/22/2011
Prior to rule 205A.b.(2)(A)
Days to report: 60
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 3/17/2025             Measured TD: 8360 ft.    Vertical TD: 8206 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 3/17/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/26/2012
Proposed Top PZ Location:Sec:25 Twp: 2N 68W Footage: 607 FSL  676 FEL
Bottom Hole Location:Sec:25 Twp: 2N 68W Footage: 607 FSL  676 FEL
Proposed Depth/Form:8360 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E2SE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 907 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 570, Top: 13 ft., Bottom: 907 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8349 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 221, Top: 7000 ft., Bottom: 8349 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5022 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 506, Top: 1835 ft., Bottom: 5100 ft.

Wellbore Completed
Completion Date:9/5/2008
Spud Date:8/30/2008Spud Date Is:ACTUAL
Measured TD:8360 ft.Measured PB depth:8333 ft.
True Vertical TD:8206 ft.True Vertical PB depth:8179 ft.
Top PZ Location:Sec:25 Twp: 2N 68WFootage: 607 FSL  676 FEL
Bottom Hole Location:Sec:25 Twp: 2N 68WFootage: 607 FSL  676 FEL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 905 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 905 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8349 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 221, Top: 7020 ft., Bottom: 8349 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8349 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 506, Top: 1830 ft., Bottom: 5100 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4134 ft.4310 ft.NN
SUSSEX4670 ft.4774 ft.NN
SHANNON5121 ft.5148 ft.NN
NIOBRARA7467 ft.NN
FORT HAYS7736 ft.NN
CODELL7757 ft.7780 ft.NN
J SAND8190 ft.8233 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 3/17/2025                 Interval Top: 8204 ft.    Interval Bottom: 8224 ft.

 Completed Information for Formation J SAND
1st Production Date:7/15/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 161,028 gal Slickwater w/ 160,220# 30/5v0, 4,000# SuperLC, 0# .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8204 ft.# Of Holes:60
Interval Bottom:8224 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/10/2011                 Interval Top: 7756 ft.    Interval Bottom: 7776 ft.

 Completed Information for Formation CODELL
1st Production Date:12/31/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/1/2008
Treatment Summary:171,000 GALS FLUID & 113,000 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7756 ft.# Of Holes:60
Interval Bottom:7776 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/27/2011                 Interval Top: 7545 ft.    Interval Bottom: 8224 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/15/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/23/2011
Treatment Summary:JSND RECOMPLETE
Tubing Size:2.375 in.Tubing Setting Depth:8167 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 3
BTU_GAS 1248
CALC_BBLS_OIL 3
CASING_PRESS 1108
GRAVITY_OIL 50
TUBING_PRESS 502
Perforation Data:
Interval Top:7545 ft.# Of Holes:180
Interval Bottom:8224 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 3/17/2025                 Interval Top: 7545 ft.    Interval Bottom: 7776 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/31/2008Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/5/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/3/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1211
CALC_BBLS_H2O 0
CALC_BBLS_OIL 37
CALC_GOR 3135
CALC_MCF_GAS 116
CASING_PRESS 700
GRAVITY_OIL 51
Perforation Data:
Interval Top:7545 ft.# Of Holes:120
Interval Bottom:7776 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/10/2011                 Interval Top: 7545 ft.    Interval Bottom: 7630 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/31/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/3/2008
Treatment Summary:1000 GALS ACID & 177,000 GALS FLUID & 249,000 LBS 20/40 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7545 ft.# Of Holes:60
Interval Bottom:7630 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY03/17/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
11/19/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No