Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27076
Well Classification: OW Status: PA - 11/15/2019
Well Name/No:CENTEX #10-25
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/15/2019
FacilityID:297342LocationID:336527
Municipality/County:FREDERICK / WELD #123Location:NESE 25 2N68W 6
Field:SPINDLE - #77900Elevation:4969 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1803FSL  840 FELLat/Long: 40.107192 / -104.945150Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.107192 / -104.945150Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/21/2011
End Date: 6/21/2011
Reported: 8/22/2011
Prior to rule 205A.b.(2)(A)
Days to report: 62
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/15/2019             Measured TD: 8364 ft.    Vertical TD: 8178 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/15/2019
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/1/2012
Proposed Top PZ Location:Sec:25 Twp: 2N 68W Footage: 1944 FSL  2117 FEL
Bottom Hole Location:Sec:25 Twp: 2N 68W Footage: 1944 FSL  2117 FEL
Proposed Depth/Form:8364 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W2SE/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 895 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 550, Top: 14 ft., Bottom: 895 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8364 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 5070 ft., Bottom: 8364 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 575, Top: 1535 ft., Bottom: 5070 ft.

Wellbore Completed
Completion Date:8/16/2008
Spud Date:8/10/2008Spud Date Is:ACTUAL
Measured TD:8364 ft.Measured PB depth:8330 ft.
True Vertical TD:8178 ft.True Vertical PB depth:8144 ft.
Top PZ Location:Sec:25 Twp: 2N 68WFootage: 1944 FSL  2117 FEL
Bottom Hole Location:Sec:25 Twp: 2N 68WFootage: 1944 FSL  2117 FEL
Log Types:CBL, CDL/CNL/ML, DIL/GL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 893 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 893 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8360 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 5070 ft., Bottom: 8360 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 1535 ft., Bottom: 5070 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5070 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 1535 ft., Bottom: 5070 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4158 ft.NN
SUSSEX4518 ft.4770 ft.NN
SHANNON5133 ft.5196 ft.NN
NIOBRARA7489 ft.NN
FORT HAYS7753 ft.NN
CODELL7774 ft.NN
J SAND8206 ft.NN

Formation JSND                     Formation Classification:  OG                     Status:  AB - 11/15/2019                Interval Top: 8216 ft.    Interval Bottom: 8236 ft.

 Completed Information for Formation J SAND
1st Production Date:7/14/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/21/2011
Treatment Summary:Frac J-Sand down 4-1/2" Csg w/ 109,788 gal Slickwater w/ 115,160# 40/70, 4,000# SuperLC, 0# .
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8216 ft.# Of Holes:60
Interval Bottom:8236 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/11/2011                 Interval Top: 7776 ft.    Interval Bottom: 7794 ft.

 Completed Information for Formation CODELL
1st Production Date:12/31/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2008
Treatment Summary:172,512 GALS FLUID & 116,120 LBS 40/70 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7776 ft.# Of Holes:54
Interval Bottom:7794 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 7/24/2011                 Interval Top: 7560 ft.    Interval Bottom: 8236 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:7/14/2011Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/24/2011
Treatment Summary:J RECOMPLETE
Tubing Size:2.375 in.Tubing Setting Depth:8171 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/24/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
BTU_GAS 1270
CALC_BBLS_OIL 2
CASING_PRESS 582
GRAVITY_OIL 51
TUBING_PRESS 278
Perforation Data:
Interval Top:7560 ft.# Of Holes:174
Interval Bottom:8236 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/15/2019                Interval Top: 7560 ft.    Interval Bottom: 7794 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/31/2008Choke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/16/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/5/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1211
CALC_BBLS_H2O 0
CALC_BBLS_OIL 28
CALC_GOR 3500
CALC_MCF_GAS 98
CASING_PRESS 600
GRAVITY_OIL 52
Perforation Data:
Interval Top:7560 ft.# Of Holes:114
Interval Bottom:7794 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/11/2011                 Interval Top: 7560 ft.    Interval Bottom: 7656 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/31/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/30/2008
Treatment Summary:1000 GALS ACID & 165,765 GALS FLUID & 250,902 LBS 20/40 SAND & 4000LBS 20/40 AC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7560 ft.# Of Holes:60
Interval Bottom:7656 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/15/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No