|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2022 Measured TD: 7292 ft. Vertical TD: 7031 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | 20083050 | Expiration Date: | 7/22/2009 | Prop Depth/Form: | 7279 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E2SW4 |
| | |
Wellbore Completed | Completion Date: | 10/16/2008 | Spud Date: | 10/10/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7292 ft. | Measured PB depth: | 7276 ft. | True Vertical TD: | 7031 ft. | True Vertical PB depth: | 7015 ft. | Top PZ Location: | Sec:2 Twp: 5N 65W | Footage: 1909 FSL 2011 FWL | Depth | Bottom Hole Location: | Sec:2 Twp: 5N 65W | Footage: 1909 FSL 2011 FWL | Depth | Log Types: | CEMENT BOND/GR, COMPENSATED DENSITY & NEUTRON/GR, DUAL INDUCTION/GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 414 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 270, Top: 0 ft., Bottom: 414 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7277 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1172, Top: 0 ft., Bottom: 7277 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3759 ft. | 4174 ft. | N | N | SUSSEX | 4480 ft. | 4687 ft. | N | N | SHANNON | 5101 ft. | 5255 ft. | N | N | NIOBRARA | 6823 ft. | 7111 ft. | N | N | CODELL | 7155 ft. | 7172 ft. | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/26/2009 Interval Top: 7156 ft. Interval Bottom: 7168 ft. Completed Information for Formation CODELL | 1st Production Date: | 1/8/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/12/2008 | Treatment Summary: | FRAC'D CODELL W/ 189500# 20/40 SAND USING 61964 GALS 26# SUPERZ. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7156 ft. | # Of Holes: | 48 | Interval Bottom: | 7168 ft. | Hole Size: | 0.39 in. |
|
Formation NB-CD Formation Classification: OW Status: PR - 5/1/2022 Interval Top: 6851 ft. Interval Bottom: 7168 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/8/2009 | Choke Size: | 0.188 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/17/2008 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/26/2009 | Test Method: | FLOWING | Hours Tested: | 8 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 29 | BTU_GAS | 1391 | CALC_GOR | 3068 | CASING_PRESS | 500 | GRAVITY_OIL | 44 | MCF_GAS | 89 |
| Perforation Data: | Interval Top: | 6851 ft. | # Of Holes: | 160 | Interval Bottom: | 7168 ft. | Hole Size: | 0.39 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/26/2009 Interval Top: 6851 ft. Interval Bottom: 6871 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 1/8/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/17/2008 | Treatment Summary: | PERFS 6851-6869', 6851-6871', FRAC'D NIOBRARA W/ 240983# 20/40 AND 12000 SB EXCEL SAND USING 71929 GAL 26# SUPERZ. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6851 ft. | # Of Holes: | 112 | Interval Bottom: | 6871 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 415 |
Total Gas Produced (MCF) | 1893 |
GOR | 4561 |
GOR Determination | BOE |
Average BOE per Day | 2.028 |
Average MCFE per Day | 11.784 |
Federal Financial Assurance | i | |
|
|