|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/22/2023 Measured TD: 7919 ft. Vertical TD: 7919 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/22/2023 | | Wellbore Permit | | | Permit #: | 20083030 | Expiration Date: | 7/16/2009 | | Proposed Depth/Form: | 7860 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 8/5/2008 | | Spud Date: | 8/2/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7919 ft. | Measured PB depth: | 7852 ft. | | True Vertical TD: | 7919 ft. | True Vertical PB depth: | 7852 ft. | | Log Types: | CBL/GR/CCL, CD/CN/ML, PNN/GR, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 729 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 378, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7915 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 743, Top: 800 ft., Bottom: 7915 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3914 ft. | | N | N | | SUSSEX | 4503 ft. | | N | N | | SHANNON | 4968 ft. | | N | N | | TEEPEE BUTTES | 6323 ft. | | N | N | | NIOBRARA | 7033 ft. | | N | N | | FORT HAYS | 7304 ft. | | N | N | | CODELL | 7317 ft. | | N | N | | D SAND | 7709 ft. | | N | N | | MOWRY | 7753 ft. | | N | N | | J SAND | 7769 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 5/22/2023 Interval Top: 7770 ft. Interval Bottom: 7815 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/20/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/14/2008 | | Treatment Summary: | JSND FRAC'D W/ 166,740 GALS SILVERSTIM & SLICKWATER; 434,392# OF 20/40 OTTAWA SAND & 15,779# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7770 ft. | # Of Holes: | 128 | | Interval Bottom: | 7815 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/20/2008 Interval Top: 7317 ft. Interval Bottom: 7332 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/20/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/19/2008 | | Treatment Summary: | CODL FRAC'D W/ 145,026 GALS 15% HCI ACID, SILVERSTIM & SLICKWATER & 271,295# OF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7317 ft. | # Of Holes: | 60 | | Interval Bottom: | 7332 ft. | Hole Size: | 0.42 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 10/3/2008 Interval Top: 7042 ft. Interval Bottom: 7815 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 9/20/2008 | Choke Size: | 0.156 in. | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/5/2008 | | Treatment Summary: | COMMINGLE THE NBRR, CODL & JSND. CODELL & J SAND PRODUCING THROUGH CAST IRON FLOW PLUGS FROM 1ST PRODUCTION DATE OF 9/20/08 UNTIL TUBING LANDED ON 10/17/08. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7728 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 24 | | BTU_GAS | 1237 | | CALC_BBLS_H2O | 4 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 6542 | | CALC_MCF_GAS | 157 | | CASING_PRESS | 360 | | GRAVITY_OIL | 61 | | MCF_GAS | 157 |
| | Perforation Data: | | Interval Top: | 7042 ft. | # Of Holes: | 252 | | Interval Bottom: | 7815 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 9/20/2008 Interval Top: 7042 ft. Interval Bottom: 7104 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/19/2008 | | Treatment Summary: | NBRR FRAC'D W/ 185,640 GALS SILVERSTIM & SLICKWATER & 252,494# 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7042 ft. | # Of Holes: | 64 | | Interval Bottom: | 7104 ft. | Hole Size: | 0.7 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/22/2023| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | No Perforation Data was found for formation NB-CD. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/22/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|