Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27016
Well Classification: GW Status: SI - 2/1/2021
Well Name/No:PIONEER #2-15
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2021
FacilityID:297191LocationID:336521
County:WELD #123Location:NWNE 15 2N65W 6
Field:WATTENBERG - #90750Elevation:4874 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1250FNL  1368 FELLat/Long: 40.142520 / -104.645450Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.142503 / -104.645442Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 2/1/2021             Measured TD: 7444 ft.    Vertical TD: 7319 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 2/1/2021
Wellbore PermitDIRECTIONAL
Permit #:20082802 Expiration Date:7/15/2009
Proposed Top PZ Location:Sec:15 Twp: 2N 65W Footage: 675 FNL  1964 FEL
Bottom Hole Location:Sec:15 Twp: 2N 65W Footage: 675 FNL  1964 FEL
Proposed Depth/Form:7382 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N2NE/4

Wellbore Completed
Completion Date:1/24/2009
Spud Date:1/20/2009Spud Date Is:ACTUAL
Measured TD:7444 ft.Measured PB depth:7363 ft.
True Vertical TD:7319 ft.True Vertical PB depth:7238 ft.
Top PZ Location:Sec:15 Twp: 2N 65WFootage: 675 FNL  1964 FEL
Bottom Hole Location:Sec:15 Twp: 2N 65WFootage: 675 FNL  1964 FEL
Log Types:CBL, PNN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 823 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 0 ft., Bottom: 823 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7393 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 3495 ft., Bottom: 7393 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4081 ft.NN
SUSSEX4376 ft.NN
SHANNON4645 ft.NN
TEEPEE BUTTES6189 ft.NN
NIOBRARA6995 ft.NN
FORT HAYS7252 ft.NN
CODELL7286 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 8/20/2009                 Interval Top: 7269 ft.    Interval Bottom: 7286 ft.

 Completed Information for Formation CODELL
1st Production Date:7/14/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/16/2009
Treatment Summary:172,754 GALS FLUID & 115,040# 30/50 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7269 ft.# Of Holes:51
Interval Bottom:7286 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 2/1/2021                  Interval Top: 7022 ft.    Interval Bottom: 7286 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/14/2009Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/24/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1224
CALC_BBLS_H2O 0
CALC_BBLS_OIL 34
CALC_GOR 5500
CALC_MCF_GAS 187
CASING_PRESS 1200
GRAVITY_OIL 51
Perforation Data:
Interval Top:7022 ft.# Of Holes:111
Interval Bottom:7286 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/20/2009                 Interval Top: 7022 ft.    Interval Bottom: 7122 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/14/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/4/2009
Treatment Summary:1000 GALS ACID & 252,521 GAL FLUID & 200,580# 30/50 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7022 ft.# Of Holes:60
Interval Bottom:7122 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY02/26/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
01/31/2021
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No