|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/1/2019 Measured TD: 7895 ft. Vertical TD: 7761 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/1/2019 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 8/26/2012 | | Proposed Top PZ Location: | Sec:15 Twp: 2N 65W | Footage: 1980 FNL 1980 FEL | | Bottom Hole Location: | Sec:15 Twp: 2N 65W | Footage: 1980 FNL 1980 FEL | | Proposed Depth/Form: | 7895 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: S2NE4 |
| | |
| Wellbore Completed | | Completion Date: | 1/19/2009 | | Spud Date: | 1/15/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 7895 ft. | Measured PB depth: | 7854 ft. | | True Vertical TD: | 7761 ft. | True Vertical PB depth: | 7720 ft. | | Top PZ Location: | Sec:15 Twp: 2N 65W | Footage: 1980 FNL 1982 FEL | | Bottom Hole Location: | Sec:15 Twp: 2N 65W | Footage: 1980 FNL 1982 FEL | | Log Types: | CDL-GR-CAL-CNL-DIL-ML, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 824 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 0 ft., Bottom: 824 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7884 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 744, Top: 5190 ft., Bottom: 7884 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4077 ft. | 4225 ft. | N | N | | SUSSEX | 4380 ft. | 4478 ft. | N | N | | SHANNON | 4651 ft. | 4680 ft. | N | N | | NIOBRARA | 7007 ft. | | N | N | | FORT HAYS | 7271 ft. | | N | N | | CODELL | 7295 ft. | | N | N | | J SAND | 7748 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/18/2009 Interval Top: 7296 ft. Interval Bottom: 7312 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/8/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/23/2009 | | Treatment Summary: | 168,267 GALS FLUID & 116,300# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7296 ft. | # Of Holes: | 48 | | Interval Bottom: | 7312 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/1/2019 Interval Top: 7008 ft. Interval Bottom: 7312 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 7/8/2009 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/8/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/18/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1223 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 8870 | | CALC_MCF_GAS | 133 | | CASING_PRESS | 1500 | | GRAVITY_OIL | 51 |
| | Perforation Data: | | Interval Top: | 7008 ft. | # Of Holes: | 120 | | Interval Bottom: | 7312 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/18/2009 Interval Top: 7008 ft. Interval Bottom: 7151 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/8/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/11/2009 | | Treatment Summary: | 246,952 GALS FLUID & 200,240# 40/70 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7008 ft. | # Of Holes: | 72 | | Interval Bottom: | 7151 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/01/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|