Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-27013
Well Classification: OW Status: SI - 2/1/2021
Well Name/No:PIONEER #31-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date2/1/2021
FacilityID:297188LocationID:336521
County:WELD #123Location:NENE 15 2N65W 6
Field:WATTENBERG - #90750Elevation:4874 ft.
Planned Location:1250FNL  1288 FELLat/Long: 40.142528 / -104.645144Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.142528 / -104.645144Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/3/2011
End Date: 3/3/2011
Reported: 4/3/2011
Prior to rule 205A.b.(2)(A)
Days to report: 31
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 2/1/2021             Measured TD: 7970 ft.    Vertical TD: 7781 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 2/1/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/26/2012
Proposed Top PZ Location:Sec:15 Twp: 2N 65W Footage: 1320 FNL  80 FWL
Bottom Hole Location:Sec:14 Twp: 2N 65W Footage: 1320 FNL  80 FWL
Proposed Depth/Form:7970 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 875 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 550, Top: 20 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7948 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 220, Top: 6678 ft., Bottom: 7948 ft.
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5050 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 200, Top: 3651 ft., Bottom: 5050 ft.

Wellbore Completed
Completion Date:1/2/2009
Spud Date:12/28/2008Spud Date Is:ACTUAL
Measured TD:7970 ft.Measured PB depth:7902 ft.
True Vertical TD:7781 ft.True Vertical PB depth:7713 ft.
Top PZ Location:Sec:15 Twp: 2N 65WFootage: 1320 FNL  80 FWL
Bottom Hole Location:Sec:14 Twp: 2N 65WFootage: 1320 FNL  80 FWL
Log Types:CDL-GR-CAL-CNL-DIL-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 867 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 867 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7933 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 3420 ft., Bottom: 7933 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4051 ft.NN
SUSSEX4269 ft.NN
SHANNON4588 ft.4750 ft.NN
NIOBRARA7074 ft.NN
FORT HAYS7348 ft.NN
CODELL7371 ft.NN
J SAND7780 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  SI - 2/1/2021                  Interval Top: 7784 ft.    Interval Bottom: 7826 ft.

 Completed Information for Formation J SAND
1st Production Date:3/24/2011Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/3/2011
Treatment Summary:J S Perf 7784-7826 Holes 64 Size 0.42 Frac J-Sand down 4-1/2" Csg w/ 163,758 gal Slickwater w/ 115,360# 40/70, 4,000# SuperLC
Tubing Size:2.375 in.Tubing Setting Depth:7766 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2011Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 2
BTU_GAS 1370
CALC_BBLS_OIL 2
CALC_GOR 7250
CALC_MCF_GAS 14
CASING_PRESS 1200
GRAVITY_OIL 52
MCF_GAS 14
TUBING_PRESS 1200
Perforation Data:
Interval Top:7784 ft.# Of Holes:64
Interval Bottom:7826 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/15/2011                 Interval Top: 7372 ft.    Interval Bottom: 7388 ft.

 Completed Information for Formation CODELL
1st Production Date:7/14/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/20/2009
Treatment Summary:167,650 GALS FLUID & 115,780# 40/70 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7372 ft.# Of Holes:48
Interval Bottom:7388 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 2/1/2021                  Interval Top: 7138 ft.    Interval Bottom: 7388 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/14/2009Choke Size:0.219 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/2/2009
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/10/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1228
CALC_BBLS_H2O 0
CALC_BBLS_OIL 60
CALC_GOR 2390
CALC_MCF_GAS 143
CASING_PRESS 1700
GRAVITY_OIL 50
Perforation Data:
Interval Top:7138 ft.# Of Holes:108
Interval Bottom:7388 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 4/15/2011                 Interval Top: 7138 ft.    Interval Bottom: 7238 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/14/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/27/2009
Treatment Summary:1000 GALS ACID & 247,376 GALS FLUID & 200,660# 40/70 SAND & 4000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7138 ft.# Of Holes:60
Interval Bottom:7238 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
01/31/2021
Low ProducingYProduction Period
02/2024 - 01/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No