|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/21/2022 Measured TD: 7733 ft. Vertical TD: 7481 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/21/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20082718 | Expiration Date: | 7/6/2009 | | Proposed Top PZ Location: | Sec:13 Twp: 3N 67W | Footage: 71 FNL 1353 FEL | | Bottom Hole Location: | Sec:13 Twp: 3N 67W | Footage: 71 FNL 1353 FEL | | Proposed Depth/Form: | 7720 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 8/14/2008 | | Spud Date: | 8/5/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7733 ft. | Measured PB depth: | 7691 ft. | | True Vertical TD: | 7481 ft. | True Vertical PB depth: | 7439 ft. | | Top PZ Location: | Sec:13 Twp: 3N 67W | Footage: 71 FNL 1353 FEL | | Bottom Hole Location: | Sec:13 Twp: 3N 67W | Footage: 71 FNL 1353 FEL | | Log Types: | CBL, PNN/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 810 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 810 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7723 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 3720 ft., Bottom: 7723 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 3720 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 3720 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4020 ft. | | N | N | | SUSSEX | 4506 ft. | | N | N | | SHANNON | 4975 ft. | | N | N | | NIOBRARA | 7261 ft. | | N | N | | FORT HAYS | 7523 ft. | | N | N | | CODELL | 7545 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 1/16/2009 Interval Top: 7532 ft. Interval Bottom: 7552 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/17/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/2/2008 | | Treatment Summary: | 137,364 GALS FLUID & 221,020# 20/40 SAND & 4,000# 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7532 ft. | # Of Holes: | 40 | | Interval Bottom: | 7552 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 6/23/2022 Interval Top: 7260 ft. Interval Bottom: 7552 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/14/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/16/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1148 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 34 | | CALC_GOR | 3770 | | CALC_MCF_GAS | 128 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 112 | | Interval Bottom: | 7552 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/16/2009 Interval Top: 7260 ft. Interval Bottom: 7418 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/17/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/3/2008 | | Treatment Summary: | 1000 GALS ACID & 165,366 GALS FLUID & 251,120# 20/40 SAND & 4,000# 20/40 SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 72 | | Interval Bottom: | 7418 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/23/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|