|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 4/27/2021 Measured TD: 8170 ft. Vertical TD: 7881 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 4/27/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/3/2012 | | Proposed Top PZ Location: | Sec:13 Twp: 3N 67W | Footage: 109 FNL 2500 FEL | | Bottom Hole Location: | Sec:13 Twp: 3N 67W | Footage: 107 FNL 2501 FEL | | Proposed Depth/Form: | 8170 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 787 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 787 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8164 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1043, Top: 2800 ft., Bottom: 8164 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 7/24/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8170 ft. | Measured PB depth: | 8147 ft. | | True Vertical TD: | 7881 ft. | True Vertical PB depth: | 7858 ft. | | Top PZ Location: | Sec:13 Twp: 3N 67W | Footage: 109 FNL 2500 FEL | | Bottom Hole Location: | Sec:13 Twp: 3N 67W | Footage: 107 FNL 2501 FEL | | Log Types: | CBL,PNN/GR | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 787 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 365, Top: 0 ft., Bottom: 787 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8164 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1043, Top: 2804 ft., Bottom: 8164 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1491 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 210, Top: 625 ft., Bottom: 1500 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4061 ft. | | N | N | | SUSSEX | 4554 ft. | | N | N | | SHANNON | 5031 ft. | | N | N | | NIOBRARA | 7302 ft. | | N | N | | FORT HAYS | 7550 ft. | | N | N | | CODELL | 7568 ft. | | N | N | | J SAND | 8075 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 4/29/2021 Interval Top: 8016 ft. Interval Bottom: 8056 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 11/10/2011 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/27/2011 | | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 166,278 gal Slickwater w/ 150,908# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 8016 ft. | # Of Holes: | 64 | | Interval Bottom: | 8056 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/1/2011 Interval Top: 7570 ft. Interval Bottom: 7590 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/28/2008 | | Treatment Summary: | 130645 GALS FLUID & 220800 LBS 20/40 SNAD & 4000 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7570 ft. | # Of Holes: | 40 | | Interval Bottom: | 7590 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 11/27/2011 Interval Top: 7302 ft. Interval Bottom: 8056 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 11/10/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/27/2011 | | Treatment Summary: | JSND REC |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7962 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/27/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | BTU_GAS | 1278 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 29750 | | CALC_MCF_GAS | 238 | | CASING_PRESS | 1032 | | GRAVITY_OIL | 53 | | MCF_GAS | 238 | | TUBING_PRESS | 968 |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 176 | | Interval Bottom: | 8056 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/29/2021 Interval Top: 7302 ft. Interval Bottom: 7590 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/17/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/4/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/14/2009 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1230 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 4750 | | CALC_MCF_GAS | 114 | | CASING_PRESS | 250 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 112 | | Interval Bottom: | 7590 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/1/2011 Interval Top: 7302 ft. Interval Bottom: 7452 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/17/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/29/2008 | | Treatment Summary: | 237837 GALS FLUID & 189340 LBS 30/50 SND & 4000 LBS 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7302 ft. | # Of Holes: | 72 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/29/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|