|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 10/1/2021 Measured TD: 7378 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 10/1/2021 | | Wellbore Permit | | | Permit #: | 20082336 | Expiration Date: | 6/23/2009 | | Proposed Depth/Form: | 8050 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 7/14/2008 | | Spud Date: | 7/10/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7378 ft. | Measured PB depth: | 7328 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GR/CCL/CBL, PULSED NEUTRON NEUTRON GAMMA RAY PROCESSED LOG | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 927 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 583, Top: 0 ft., Bottom: 927 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7351 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 920, Top: 1374 ft., Bottom: 7385 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 2878 ft. | | N | N | | PARKMAN | 3999 ft. | | N | N | | SUSSEX | 4580 ft. | | N | N | | TEEPEE BUTTES | 6267 ft. | | N | N | | NIOBRARA | 6914 ft. | | N | N | | FORT HAYS | 7204 ft. | | N | N | | CODELL | 7228 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 2/1/2011 Interval Top: 7214 ft. Interval Bottom: 7225 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/16/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/8/2008 | | Treatment Summary: | CODL FRAC'D W/3478 GALS SILVERSTIM & SLICKWATER & 15% HCL, WITH 270,404# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7214 ft. | # Of Holes: | 44 | | Interval Bottom: | 7225 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: OW Status: SI - 10/1/2021 Interval Top: 6980 ft. Interval Bottom: 7225 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/16/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/8/2008 | | Treatment Summary: | COMMINGLED CODL & NBRR. CODELL PRODUCING THROUGH CAST RON FLOW PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/26/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 18 | | BBLS_OIL | 92 | | BTU_GAS | 1271 | | CALC_BBLS_H2O | 18 | | CALC_BBLS_OIL | 92 | | CALC_GOR | 3283 | | CALC_MCF_GAS | 302 | | CASING_PRESS | 900 | | GRAVITY_OIL | 46 | | MCF_GAS | 302 |
| | Perforation Data: | | Interval Top: | 6980 ft. | # Of Holes: | 108 | | Interval Bottom: | 7225 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 2/1/2011 Interval Top: 6980 ft. Interval Bottom: 6996 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/16/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/8/2008 | | Treatment Summary: | NBRR FRAC'D W/ 4406 GALS SLICKWATER & SILVERSTIM W/ 246,707# OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6980 ft. | # Of Holes: | 64 | | Interval Bottom: | 6996 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 09/30/2021 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|