Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26890
Well Classification: OW Status: PA - 9/26/2018
Well Name/No:BULTHAUP #24-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/26/2018
FacilityID:296731LocationID:336524
Municipality/County:ERIE / WELD #123Location:SENE 6 1N68W 6
Field:SPINDLE - #77900Elevation:4987 ft.
Planned Location:2125FNL  705 FELLat/Long: 40.081900 / -105.039620Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.081890 / -105.039610Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/4/2012
End Date: 4/4/2012
Reported: 5/24/2012
Days to report: 50
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 9/18/2018             Measured TD: 7965 ft.    Vertical TD: 7865 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 9/18/2018
Wellbore PermitDIRECTIONAL
Permit #:20082145 Expiration Date:6/23/2009
Prop Depth/Form:7987 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:9/29/2008
Spud Date:9/23/2008Spud Date Is:ACTUAL
Measured TD:7965 ft.Measured PB depth:7934 ft.
True Vertical TD:7865 ft.True Vertical PB depth:7834 ft.
Top PZ Location:Sec:6 Twp: 1N 68WFootage: 2604 FSL  1341 FEL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 2630 FSL  1341 FEL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 685 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 685 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7949 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 2780 ft., Bottom: 7949 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 950 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 199, Top: 675 ft., Bottom: 948 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 675 ft., Depth: 950 ft., Bottom: 948 ft., Sacks: 199, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN4034 ft.4242 ft.NN
SUSSEX4458 ft.4784 ft.NN
SHANNON5054 ft.5124 ft.NN
NIOBRARA7500 ft.NN
FORT HAYS7776 ft.NN
CODELL7796 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/10/2012                 Interval Top: 7798 ft.    Interval Bottom: 7815 ft.

 Completed Information for Formation CODELL
1st Production Date:2/17/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2012
Treatment Summary:CD PERF 7798-7815 HOLES 68 SIZE 0.38 4/4/12 -Refrac CODL down 4.5" casing w/ 196,980 gal slickwater. No proppant used on this job. Broke @ 2,042 psi @ 11.1 bpm. ATP=4,177 psi; MTP=4,834 psi; ATR=62.4 bpm; ISDP=2,766 psi 4/20/12 -Return well to production after CD Refrac
Formation Treatment
Treatment Date:11/6/2008
Treatment Summary:198,080 GALS FLUID & 151,540 30/50 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7798 ft.# Of Holes:68
Interval Bottom:7815 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 9/26/2018                 Interval Top: 7500 ft.    Interval Bottom: 7815 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/17/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/4/2012
Treatment Summary:NB PERF 7500-7704 HOLES 66 SIZE 0.38 CD PERF 7798-7815 HOLES 68 SIZE 0.38 4/4/12 REFRAC CODELL 4/20/12 RETURN WELL TO PRODUCTION AFTER CODELL REFRAC
Formation Treatment
Treatment Date:9/29/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7754 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/23/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 9
BTU_GAS 1192
CALC_BBLS_H2O 0
CALC_BBLS_OIL 9
CALC_GOR 5667
CALC_MCF_GAS 51
CASING_PRESS 1064
GRAVITY_OIL 50
MCF_GAS 51
TUBING_PRESS 913
Perforation Data:
Interval Top:7500 ft.# Of Holes:134
Interval Bottom:7815 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 6/2/2009                  Interval Top: 7500 ft.    Interval Bottom: 7704 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/17/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/10/2008
Treatment Summary:240,618 GALS FLUID & 200,140# 30/50 SAND & 4,000# 20/40 SB EXCEL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7500 ft.# Of Holes:66
Interval Bottom:7704 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
09/18/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No