|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/18/2018 Measured TD: 7965 ft. Vertical TD: 7865 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/18/2018 | Wellbore Permit | DIRECTIONAL | Permit #: | 20082145 | Expiration Date: | 6/23/2009 | Prop Depth/Form: | 7987 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 9/29/2008 | Spud Date: | 9/23/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7965 ft. | Measured PB depth: | 7934 ft. | True Vertical TD: | 7865 ft. | True Vertical PB depth: | 7834 ft. | Top PZ Location: | Sec:6 Twp: 1N 68W | Footage: 2604 FSL 1341 FEL | Bottom Hole Location: | Sec:6 Twp: 1N 68W | Footage: 2630 FSL 1341 FEL | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 685 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 430, Top: 0 ft., Bottom: 685 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7949 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 720, Top: 2780 ft., Bottom: 7949 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 950 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 199, Top: 675 ft., Bottom: 948 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 675 ft., Depth: 950 ft., Bottom: 948 ft., Sacks: 199, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4034 ft. | 4242 ft. | N | N | SUSSEX | 4458 ft. | 4784 ft. | N | N | SHANNON | 5054 ft. | 5124 ft. | N | N | NIOBRARA | 7500 ft. | | N | N | FORT HAYS | 7776 ft. | | N | N | CODELL | 7796 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 5/10/2012 Interval Top: 7798 ft. Interval Bottom: 7815 ft. Completed Information for Formation CODELL | 1st Production Date: | 2/17/2009 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/4/2012 | Treatment Summary: | CD PERF 7798-7815 HOLES 68 SIZE 0.38
4/4/12 -Refrac CODL down 4.5" casing w/ 196,980 gal slickwater. No proppant used on this job.
Broke @ 2,042 psi @ 11.1 bpm. ATP=4,177 psi; MTP=4,834 psi; ATR=62.4 bpm; ISDP=2,766 psi
4/20/12 -Return well to production after CD Refrac | Formation Treatment | Treatment Date: | 11/6/2008 | Treatment Summary: | 198,080 GALS FLUID & 151,540 30/50 SAND & 4,000# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7798 ft. | # Of Holes: | 68 | Interval Bottom: | 7815 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/26/2018 Interval Top: 7500 ft. Interval Bottom: 7815 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 2/17/2009 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/4/2012 | Treatment Summary: | NB PERF 7500-7704 HOLES 66 SIZE 0.38
CD PERF 7798-7815 HOLES 68 SIZE 0.38
4/4/12 REFRAC CODELL
4/20/12 RETURN WELL TO PRODUCTION AFTER CODELL REFRAC | Formation Treatment | Treatment Date: | 9/29/2008 | Treatment Summary: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7754 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/23/2012 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 9 | BTU_GAS | 1192 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 9 | CALC_GOR | 5667 | CALC_MCF_GAS | 51 | CASING_PRESS | 1064 | GRAVITY_OIL | 50 | MCF_GAS | 51 | TUBING_PRESS | 913 |
| Perforation Data: | Interval Top: | 7500 ft. | # Of Holes: | 134 | Interval Bottom: | 7815 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/2/2009 Interval Top: 7500 ft. Interval Bottom: 7704 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 2/17/2009 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/10/2008 | Treatment Summary: | 240,618 GALS FLUID & 200,140# 30/50 SAND & 4,000# 20/40 SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7500 ft. | # Of Holes: | 66 | Interval Bottom: | 7704 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | Cut and Cap Date 09/18/2018 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|