Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26885
Well Classification: GW Status: PA - 11/30/2022
Well Name/No:BULTHAUP #16-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/30/2022
FacilityID:296726LocationID:336528
Municipality/County:ERIE / WELD #123Location:SESE 6 1N68W 6
Field:SPINDLE - #77900Elevation:5019 ft.
Planned Location:601FSL  585 FELLat/Long: 40.074650 / -105.039410Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.074649 / -105.039406Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/5/2012
End Date: 4/5/2012
Reported: 5/24/2012
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/30/2022             Measured TD: 7920 ft.    Vertical TD: 7916 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/30/2022
Wellbore PermitDIRECTIONAL
Permit #:20082147 Expiration Date:6/23/2009
Prop Depth/Form:7928 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S/2SE

Wellbore Completed
Completion Date:9/11/2008
Spud Date:9/5/2008Spud Date Is:ACTUAL
Measured TD:7920 ft.Measured PB depth:7874 ft.
True Vertical TD:7916 ft.True Vertical PB depth:7871 ft.
Top PZ Location:Sec:6 Twp: 1N 68WFootage: 679 FSL  659 FEL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 679 FSL  659 FEL
Log Types:CDL-GR-CAL-CNL-DIL-ML, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 676 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 646 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7906 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 7000 ft., Bottom: 7906 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5180 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 230, Top: 4994 ft., Bottom: 5180 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4056 ft.4260 ft.NN
SUSSEX4455 ft.4654 ft.NN
SHANNON4998 ft.5105 ft.NN
NIOBRARA7410 ft.NN
FORT HAYS7739 ft.NN
CODELL7761 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/10/2012                 Interval Top: 7762 ft.    Interval Bottom: 7782 ft.

 Completed Information for Formation CODELL
1st Production Date:7/20/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2012
Treatment Summary:CD PERF 7762-7782 HOLES 60 SIZE 0.38 4/5/12 -Refrac CODL down 4.5" casing w/ 198,190 gal slickwater w/ 150,080# 40/70, 4,000# 20/40. Broke @ 2,623 psi @ 11.1 bpm. ATP=4,233 psi; MTP=4,554 psi; ATR=59.3 bpm; ISDP=2,690 psi 4/25/12 -RWTP UP TBG AFTER CD RF
Formation Treatment
Treatment Date:10/10/2008
Treatment Summary:163,849 GALS FLUID & 115,440# 30/50 SAND 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7762 ft.# Of Holes:60
Interval Bottom:7782 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 11/30/2022                Interval Top: 7410 ft.    Interval Bottom: 7782 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/20/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/5/2012
Treatment Summary:NB PERF 7410-7644 HOLES 66 SIZE 0.42 CD PERF 7762-7782 HOLES 60 SIZE 0.38 4/5/12 -REFRAC CODELL 4/25/12 -RWTP UP TBG AFTER CD RF
Formation Treatment
Treatment Date:7/20/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7738 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/3/2012Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 8
BTU_GAS 1192
CALC_BBLS_H2O 0
CALC_BBLS_OIL 8
CALC_GOR 2750
CALC_MCF_GAS 22
CASING_PRESS 1221
GRAVITY_OIL 50
MCF_GAS 22
TUBING_PRESS 1025
Perforation Data:
Interval Top:7410 ft.# Of Holes:126
Interval Bottom:7782 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 8/27/2009                 Interval Top: 7410 ft.    Interval Bottom: 7544 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/20/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/13/2008
Treatment Summary:1000 GALS ACID & 245,421 GALS FLUID & 202,020# 30/50 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7410 ft.# Of Holes:66
Interval Bottom:7544 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
11/30/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No