Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26882
Well Classification: OW Status: PA - 11/29/2022
Well Name/No:BULTHAUP #27-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/29/2022
FacilityID:296723LocationID:336466
Municipality/County:ERIE / WELD #123Location:NENE 6 1N68W 6
Field:SPINDLE - #77900Elevation:4982 ft.
Planned Location:699FNL  624 FELLat/Long: 40.085830 / -105.039210Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.085823 / -105.039218Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 11/29/2022             Measured TD: 7908 ft.    Vertical TD: 7800 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 11/29/2022
Wellbore PermitDIRECTIONAL
Permit #:20082475 Expiration Date:6/23/2009
Prop Depth/Form:7889 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:10/18/2008
Spud Date:10/12/2008Spud Date Is:ACTUAL
Measured TD:7908 ft.Measured PB depth:7868 ft.
True Vertical TD:7800 ft.True Vertical PB depth:7760 ft.
Top PZ Location:Sec:6 Twp: 1N 68WFootage: 59 FNL  1322 FEL
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 59 FNL  1322 FEL
Log Types:CBL, CDL/CNL/ML, DIL/GL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 678 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 678 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7898 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 3417 ft., Bottom: 7898 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3980 ft.4194 ft.NN
SUSSEX4412 ft.4660 ft.NN
SHANNON5001 ft.5030 ft.NN
NIOBRARA7412 ft.NN
FORT HAYS7707 ft.NN
CODELL7727 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/4/2009                  Interval Top: 7728 ft.    Interval Bottom: 7746 ft.

 Completed Information for Formation CODELL
1st Production Date:2/17/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2009
Treatment Summary:165959 GALS FLUID & 115160 LBS 40/70 SAND & 4080 LBS SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7728 ft.# Of Holes:54
Interval Bottom:7746 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/29/2022                Interval Top: 7504 ft.    Interval Bottom: 7746 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/17/2009Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/18/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/4/2009Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1332
CALC_BBLS_H2O 0
CALC_BBLS_OIL 49
CALC_GOR 2040
CALC_MCF_GAS 100
CASING_PRESS 300
GRAVITY_OIL 52
Perforation Data:
Interval Top:7504 ft.# Of Holes:178
Interval Bottom:7746 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 4/4/2009                  Interval Top: 7504 ft.    Interval Bottom: 7620 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/17/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/6/2009
Treatment Summary:1000 GALS ACID & 386274 GALS FLUID & 300580 LBS 40/70 SAND & 8180 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7504 ft.# Of Holes:124
Interval Bottom:7620 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedYCut and Cap Date
11/29/2022
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2023 - October 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No