Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26822
Well Classification: OW Status: PA - 8/2/2021
Well Name/No:BURCHFIELD #22-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/2/2021
FacilityID:296622LocationID:336080
County:WELD #123Location:SWSW 21 3N67W 6
Field:WATTENBERG - #90750Elevation:4789 ft.
Planned Location:802FSL  553 FWLLat/Long: 40.206240 / -104.902570Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.206231 / -104.902583Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/2/2021             Measured TD: 7640 ft.    Vertical TD: 7255 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/2/2021
Wellbore PermitDIRECTIONAL
Permit #:20052208 Expiration Date:6/17/2009
Proposed Top PZ Location:Sec:21 Twp: 3N 67W Footage: 2626 FNL  1210 FWL
Bottom Hole Location:Sec:21 Twp: 3N 67W Footage: 2626 FNL  1210 FWL
Proposed Depth/Form:7658 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:8/27/2008
Spud Date:8/21/2008Spud Date Is:ACTUAL
Measured TD:7640 ft.Measured PB depth:7600 ft.
True Vertical TD:7255 ft.True Vertical PB depth:7215 ft.
Top PZ Location:Sec:21 Twp: 3N 67WFootage: 2626 FNL  1210 FWL
Bottom Hole Location:Sec:21 Twp: 3N 67WFootage: 2626 N  1210 W
Log Types:CBL, BIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 904 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 904 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7631 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 690, Top: 3440 ft., Bottom: 7631 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3746 ft.NN
SUSSEX4264 ft.4510 ft.NN
SHANNON4788 ft.4824 ft.NN
NIOBRARA7170 ft.NN
FORT HAYS7427 ft.NN
CODELL7449 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/8/2008                 Interval Top: 7450 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation CODELL
1st Production Date:10/14/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2008
Treatment Summary:128,940 GALS FLUID & 221,140 LBS 20/40 SAND & 4,000 LBS 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7450 ft.# Of Holes:40
Interval Bottom:7470 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/2/2021                  Interval Top: 7200 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/14/2008Choke Size:0.156 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/27/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1150
CALC_BBLS_OIL 46
CALC_GOR 1174
CALC_MCF_GAS 54
CASING_PRESS 1075
GRAVITY_OIL 51
Perforation Data:
Interval Top:7200 ft.# Of Holes:82
Interval Bottom:7470 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/8/2008                 Interval Top: 7200 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/14/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/15/2008
Treatment Summary:237,930 GALS FLUID & 200,300 LBS 40/70 SAND & 4,000 LSB 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7200 ft.# Of Holes:42
Interval Bottom:7322 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/02/2021
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No