|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 6/22/2023 Measured TD: 7367 ft. Vertical TD: 7367 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/22/2023 | | Wellbore Permit | | | Permit #: | 20082067 | Expiration Date: | 6/9/2009 | | Proposed Depth/Form: | 7820 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | STATE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 7/8/2008 | | Spud Date: | 7/4/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7367 ft. | Measured PB depth: | 7307 ft. | | True Vertical TD: | 7367 ft. | True Vertical PB depth: | 7307 ft. | | Log Types: | CBL/GR/CCL, CDL/CN/ML, DIL/GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 651 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 367, Top: 0 ft., Bottom: 651 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7348 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 960, Top: 2260 ft., Bottom: 7348 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3775 ft. | | N | N | | SUSSEX | 4378 ft. | | N | N | | SHANNON | 5018 ft. | | N | N | | TEEPEE BUTTES | 6117 ft. | | N | N | | NIOBRARA | 6860 ft. | | N | N | | FORT HAYS | 7141 ft. | | N | N | | CODELL | 7164 ft. | | N | N | | GREENHORN | 7227 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/22/2023 Interval Top: 7166 ft. Interval Bottom: 7177 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/20/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/8/2008 | | Treatment Summary: | CODL FRAC'D W/ 1,005 GALS 15% HCI ACID; 144,312 GALS VISTAR & SLICKWATER & 273,000# 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7166 ft. | # Of Holes: | 44 | | Interval Bottom: | 7177 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/22/2023 Interval Top: 6880 ft. Interval Bottom: 7177 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/20/2008 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/8/2008 | | Treatment Summary: | COMMINGLE NBRR & CODL. CODL PRODUCING THROUGH CAST IRON FLOW PLUG. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/5/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 30 | | BTU_GAS | 1221 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 600 | | CASING_PRESS | 600 | | GRAVITY_OIL | 60 | | MCF_GAS | 600 |
| | Perforation Data: | | Interval Top: | 6880 ft. | # Of Holes: | 172 | | Interval Bottom: | 7177 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 6/22/2023 Interval Top: 6880 ft. Interval Bottom: 6944 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/8/2008 | | Treatment Summary: | NBRR FRAC'D W/ 1,000 GALS 15% HCI ACID; 121,758 GALS VISTAR & 62,000 GALS SLICKWATER & 250,100# OF 20/40 OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6880 ft. | # Of Holes: | 128 | | Interval Bottom: | 6944 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/22/2023 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|