|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 11/10/2025 Measured TD: 8142 ft. Vertical TD: 8068 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 11/10/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20081900 | Expiration Date: | 6/5/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 513 FSL 510 FEL | | Bottom Hole Location: | Sec:16 Twp: 2N 68W | Footage: 513 FNL 510 FEL | | Proposed Depth/Form: | 8115 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407,407-66, Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: E/2 | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5055 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 220, Top: 4149 ft., Bottom: 5055 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/20/2008 | | Spud Date: | 10/14/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8142 ft. | Measured PB depth: | 8089 ft. | | True Vertical TD: | 8068 ft. | True Vertical PB depth: | 8015 ft. | | Top PZ Location: | Sec:16 Twp: 2N 68W | Footage: 562 FSL 522 FEL | | Bottom Hole Location: | Sec:16 Twp: 2N 68W | Footage: 562 FSL 522 FEL | | Log Types: | CBL, DUAL IND/COMP DENSITY/COMP NEUTRON | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 683 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 683 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8126 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 6560 ft., Bottom: 8126 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5085 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 3950 ft., Bottom: 5085 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5085 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 3950 ft., Bottom: 5085 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4373 ft. | | N | N | | SHANNON | 4821 ft. | | N | N | | NIOBRARA | 7254 ft. | | N | N | | CODELL | 7533 ft. | | N | N | | J SAND | 7959 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/10/2025 Interval Top: 7972 ft. Interval Bottom: 7986 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2008 | | Treatment Summary: | JSND COMPLETION; J SAND FRAC'D W/ 142,884 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,400# SAND 11/4/08 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7972 ft. | # Of Holes: | 28 | | Interval Bottom: | 7986 ft. | Hole Size: | 0.41 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 12/10/2008 Interval Top: 7314 ft. Interval Bottom: 7986 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/20/2008 | | Treatment Summary: | JSND-NB-CD COMMINGLE |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7956 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 43 | | BTU_GAS | 1147 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 4860 | | CALC_MCF_GAS | 209 | | CASING_PRESS | 869 | | GRAVITY_OIL | 52 | | MCF_GAS | 209 | | TUBING_PRESS | 228 |
| | Perforation Data: | | Interval Top: | 7314 ft. | # Of Holes: | 148 | | Interval Bottom: | 7986 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 11/10/2025 Interval Top: 7314 ft. Interval Bottom: 7554 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/4/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 123 | | BBLS_OIL | 66 | | BTU_GAS | 1147 | | CALC_BBLS_H2O | 123 | | CALC_BBLS_OIL | 66 | | CALC_GOR | 9818 | | CALC_MCF_GAS | 648 | | CASING_PRESS | 787 | | GRAVITY_OIL | 51 | | MCF_GAS | 648 |
| | Perforation Data: | | Interval Top: | 7314 ft. | # Of Holes: | 120 | | Interval Bottom: | 7554 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/20/2025 Interval Top: 7314 ft. Interval Bottom: 7334 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7314 ft. | # Of Holes: | 40 | | Interval Bottom: | 7334 ft. | Hole Size: | 0.73 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/20/2025 Interval Top: 6528 ft. Interval Bottom: 6538 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6528 ft. | # Of Holes: | 40 | | Interval Bottom: | 6538 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/10/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|