Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26752
Well Classification: GW Status: SI - 11/1/2022
Well Name/No:DUCKWORTH #33-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2022
FacilityID:296346LocationID:336433
County:WELD #123Location:SWSE 16 2N68W 6
Field:WATTENBERG - #90750Elevation:4882 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:758FSL  1453 FELLat/Long: 40.133580 / -105.003930Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.133584 / -105.003947Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/23/2013
End Date: 8/23/2013
Reported: 10/20/2013
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 11/1/2022             Measured TD: 8243 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 11/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20081901 Expiration Date:6/5/2009
Proposed Top PZ Location:Sec:16 Twp: 2N 68W Footage: 2115 FSL  1973 FEL
Bottom Hole Location:Sec:16 Twp: 2N 68W Footage: 2115 FSL  1973 FEL
Proposed Depth/Form:8202 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 320, Drill Unit: E/2
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5118 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 220, Top: 4215 ft., Bottom: 5118 ft.

Wellbore Completed
Completion Date:10/26/2008
Spud Date:10/20/2008Spud Date Is:ACTUAL
Measured TD:8243 ft.Measured PB depth:8170 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec:16 Twp: 2N 68WFootage: 2115 FSL  1973 FEL
Bottom Hole Location:Sec:16 Twp: 2N 68WFootage: 2115 FSL  1973 FEL
Log Types:CBL, DUAL IND/COMP DENSITY/COMP NEUTRON
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 708 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 324, Top: 0 ft., Bottom: 708 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8228 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 6630 ft., Bottom: 8228 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5076 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 3740 ft., Bottom: 5110 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1924 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 417, Top: 0 ft., Bottom: 1910 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4288 ft.NN
SHANNON4895 ft.NN
NIOBRARA7341 ft.NN
CODELL7618 ft.NN
J SAND8047 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 10/1/2022                 Interval Top: 8060 ft.    Interval Bottom: 8072 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2008
Treatment Summary:FRACD W/ 153,426 GAL 20# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,640# SAND 11/9/08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8060 ft.# Of Holes:24
Interval Bottom:8072 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 11/19/2019                Interval Top: 7618 ft.    Interval Bottom: 7638 ft.

 Completed Information for Formation CODELL
1st Production Date:11/15/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/23/2013Treatment End Date:8/23/2013
Treatment Summary:Re-Frac Codell with 251,800 #20/40 and 84,252 gals SLF
Total fluid used in treatment (bbls):2006Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7618 ft.# Of Holes:80
Interval Bottom:7638 ft.Hole Size:0.4166667 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 12/10/2008                Interval Top: 7404 ft.    Interval Bottom: 8072 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/26/2008
Treatment Summary:JSND-NB-CD COMMINGLE
Tubing Size:2.375 in.Tubing Setting Depth:8044 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/10/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 28
BBLS_OIL 43
BTU_GAS 1147
CALC_BBLS_H2O 28
CALC_BBLS_OIL 43
CALC_GOR 4860
CALC_MCF_GAS 209
CASING_PRESS 1111
GRAVITY_OIL 521
MCF_GAS 209
TUBING_PRESS 386
Perforation Data:
Interval Top:7404 ft.# Of Holes:132
Interval Bottom:8072 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 11/1/2022                 Interval Top: 7404 ft.    Interval Bottom: 7638 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/9/2008
Treatment Summary:FRAC'D CD W/ 111720 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 250,780# SAND 11/9/08; FRACD NB W/ 127,680 GAL 18# VISTAR BYBRID CROSS LINKED GEL W/ 250040# SAND 11/9/08
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/13/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 65
BBLS_OIL 50
BTU_GAS 1147
CALC_BBLS_H2O 65
CALC_BBLS_OIL 50
CALC_GOR 6820
CALC_MCF_GAS 341
CASING_PRESS 580
GRAVITY_OIL 51
MCF_GAS 341
Perforation Data:
Interval Top:7404 ft.# Of Holes:108
Interval Bottom:7638 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 11/19/2019                Interval Top: 7404 ft.    Interval Bottom: 7418 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/12/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/23/2013Treatment End Date:8/19/2013
Treatment Summary:Re-Frac Niobrara with 250,000 #20/40 and 91,644 gals SLF
Total fluid used in treatment (bbls):2182Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7404 ft.# Of Holes:28
Interval Bottom:7418 ft.Hole Size:0.7142857 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
10/31/2022
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No