|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 7/13/2024 Measured TD: 6980 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 7/13/2024 | | Wellbore Permit | | | Permit #: | 20081755 | Expiration Date: | 6/4/2009 | | Proposed Depth/Form: | 7000 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: S2NW4 |
| | |
| Wellbore Completed | | Completion Date: | 11/16/2008 | | Spud Date: | 11/11/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 6980 ft. | Measured PB depth: | 6929 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | COMPENSATED DENSITY NEUTRON GAMMA RAY; DUAL INDUCTION LOG GAMMA RAY; CEMENT BOND- VD | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 479 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 479 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6944 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 580, Top: 2860 ft., Bottom: 6944 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | GREELEY SAND | 2786 ft. | | N | N | | PARKMAN | 3538 ft. | | N | N | | SUSSEX | 4254 ft. | | N | N | | SHANNON | 4893 ft. | | N | N | | NIOBRARA | 6478 ft. | | N | N | | FORT HAYS | 6737 ft. | | N | N | | CODELL | 6773 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/10/2008 Interval Top: 6773 ft. Interval Bottom: 6785 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/28/2008 | Choke Size: | 0.219 in. | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/25/2008 | | Treatment Summary: | FRAC CODELL WITH 4244 BBLS SLICKWATER AND 115000 30/50 SAND. SPEARHEAD 500 BBLS 7% KCL AHEAD OF FRAC. TREAT AT AN AVERAGE OF 4944 PSI 60.3BPM. MAX PRESSURE 5588 PSI, MAX RATE 60.5BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/10/2008 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 4 | | BBLS_OIL | 60 | | BTU_GAS | 1242 | | CALC_GOR | 1500 | | CASING_PRESS | 350 | | GRAVITY_OIL | 47 | | MCF_GAS | 90 |
| | Perforation Data: | | Interval Top: | 6773 ft. | # Of Holes: | 48 | | Interval Bottom: | 6785 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/27/2010 Interval Top: 6480 ft. Interval Bottom: 6614 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/15/2009 | Choke Size: | 0.281 in. | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/14/2009 | | Treatment Summary: | FRAC NIOBRARA WITH 4120 BBLS DYNAFLOW 2 WR FLUID, 238,000# 30/50 SAND, AND 12,000# 20/40 RESIN COATED SAND. SPEARHEAD 23.8 BBLS 15% ACID AHEAD OF FRAC AND 500 BBLS 7% KCL IN PRE-PAD. TREAT AT AN AVERAGE OF 4179 PSI 51.1 BPM. MAX. PRESSURE CONT. NEXT PAGE |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/27/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 25 | | BTU_GAS | 1242 | | CALC_GOR | 2000 | | CASING_PRESS | 225 | | GRAVITY_OIL | 47 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 6480 ft. | # Of Holes: | 248 | | Interval Bottom: | 6614 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/13/2024| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/10/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/10/2010 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/23/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 30 | | BTU_GAS | 1242 | | CALC_GOR | 2167 | | CASING_PRESS | 750 | | GRAVITY_OIL | 47 | | MCF_GAS | 65 | | TUBING_PRESS | 675 |
| | Perforation Data: | | Interval Top: | | # Of Holes: | | | Interval Bottom: | | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 02/14/2024 |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|