|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/7/2023 Measured TD: 7841 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/7/2023 | Wellbore Permit | | Permit #: | | Expiration Date: | 12/14/2010 | Proposed Depth/Form: | 7841 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 780 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 357, Top: 0 ft., Bottom: 780 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7825 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 917, Top: 1410 ft., Bottom: 7825 ft. |
| | |
Wellbore Completed | Completion Date: | 7/1/2008 | Spud Date: | 6/25/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7841 ft. | Measured PB depth: | 7825 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL, P/E AILC - CNLD - ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 773 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 357, Top: 0 ft., Bottom: 773 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7825 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 917, Top: 1410 ft., Bottom: 7825 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3515 ft. | 3820 ft. | N | N | SUSSEX | 4114 ft. | 4260 ft. | N | N | SHANNON | 4570 ft. | 4670 ft. | N | N | NIOBRARA | 6882 ft. | | N | N | FORT HAYS | 7178 ft. | | N | N | CODELL | 7200 ft. | | N | N | J SAND | 7665 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 3/1/2009 Interval Top: 7199 ft. Interval Bottom: 7219 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/2/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/21/2008 | Treatment Summary: | FRAC CODL W/ 192,243 GAL SW & 150,680# 40/70 SAND & 4,000# SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1401 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 14 | CASING_PRESS | 1200 | GRAVITY_OIL | 52 |
| Perforation Data: | Interval Top: | 7199 ft. | # Of Holes: | 60 | Interval Bottom: | 7219 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/7/2023 Interval Top: 6908 ft. Interval Bottom: 7219 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/2/2008 | Choke Size: | 0.344 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/1/2008 | Treatment Summary: | NBRR PERF 6908-7022, HOLES 30, SIZE 0.42 // CODL PERF 7199-7219, HOLES 60, SIZE 0.38 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7162 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/1/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1231 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 22 | CALC_GOR | 3000 | CALC_MCF_GAS | 66 | CASING_PRESS | 1267 | GRAVITY_OIL | 46 | TUBING_PRESS | 1084 |
| Perforation Data: | Interval Top: | 6908 ft. | # Of Holes: | 90 | Interval Bottom: | 7219 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 3/1/2009 Interval Top: 6908 ft. Interval Bottom: 7022 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/2/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/21/2008 | Treatment Summary: | FRAC NBRR W/ 250,607 GAL SW & 200,700# 40/70 SAND & 4,000# SB EXCEL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6908 ft. | # Of Holes: | 30 | Interval Bottom: | 7022 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 04/07/2023 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|