|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 10/12/2021 Measured TD: 7839 ft. Vertical TD: 7679 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 10/12/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20081771 | Expiration Date: | 6/3/2009 | | Proposed Top PZ Location: | Sec:29 Twp: 2N 68W | Footage: 1183 FNL 1355 FEL | | Bottom Hole Location: | Sec:29 Twp: 2N 68W | Footage: 1183 FNL 1356 FEL | | Proposed Depth/Form: | 7847 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 525, Top: , Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7847 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: , Bottom: 7847 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/1/2008 | | Spud Date: | 6/26/2008 | Spud Date Is: | Actual | | Measured TD: | 7839 ft. | Measured PB depth: | 7843 ft. | | True Vertical TD: | 7679 ft. | True Vertical PB depth: | 7683 ft. | | Top PZ Location: | Sec:29 Twp: 2N 68W | Footage: 1183 FNL 1355 FEL | | Bottom Hole Location: | Sec:29 Twp: 2N 68W | Footage: 1183 FNL 1356 FEL | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 772 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 772 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7799 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 2940 ft., Bottom: 7799 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3902 ft. | 4095 ft. | N | N | | SUSSEX | 4464 ft. | 4682 ft. | N | N | | SHANNON | 4944 ft. | 4988 ft. | N | N | | TEEPEE BUTTES | 5866 ft. | | N | N | | NIOBRARA | 7392 ft. | | N | N | | FORT HAYS | 7622 ft. | | N | N | | CODELL | 7690 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 12/4/2008 Interval Top: 7693 ft. Interval Bottom: 7713 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/10/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2008 | | Treatment Summary: | 210,00 GALS FLUID & 118,000 LBS 30/50 SAND & 4000 LBS 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7693 ft. | # Of Holes: | 60 | | Interval Bottom: | 7713 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/19/2021 Interval Top: 7471 ft. Interval Bottom: 7713 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/10/2008 | Choke Size: | 0.353 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/10/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/4/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1285 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 29 | | CALC_GOR | 3870 | | CALC_MCF_GAS | 112 | | CASING_PRESS | 1720 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 7471 ft. | # Of Holes: | 120 | | Interval Bottom: | 7713 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 12/4/2008 Interval Top: 7471 ft. Interval Bottom: 7571 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/10/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2008 | | Treatment Summary: | 203,000 GALS FLUID & 204,000 LBS 30/50 SAND & 4000 LBS 20/40 R/C SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7471 ft. | # Of Holes: | 60 | | Interval Bottom: | 7571 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/19/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|