Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26715
Well Classification: GW Status: PA - 11/28/2023
Well Name/No:CONNELL X3 #3-7-31
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/28/2023
FacilityID:296274LocationID:332840
County:WELD #123Location:NESW 31 5N65W 6
Field:WATTENBERG - #90750Elevation:4659 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2578FSL  1685 FWLLat/Long: 40.355550 / -104.709660Lat/Long Source: Field Measured
As Drilled Location:2573 FSL  1669 FWLLat/Long: 40.355530 / -104.709720Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 11/28/2023             Measured TD: 8100 ft.    Vertical TD: 7720 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 11/28/2023
Wellbore PermitDIRECTIONAL
Permit #:20081137 Expiration Date:6/2/2009
Proposed Top PZ Location:Sec:31 Twp: 5N 65W Footage: 615 FSL  1856 FWL
Bottom Hole Location:Sec:31 Twp: 5N 65W Footage: 615 FSL  1856 FWL
Proposed Depth/Form:8040 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:VALLEY CONNELL Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: S/2 31
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 318, Unit Acreage: 80, Drill Unit: E2SW4

Wellbore Completed
Completion Date:8/12/2008
Spud Date:8/5/2008Spud Date Is:ACTUAL
Measured TD:8100 ft.Measured PB depth:8090 ft.
True Vertical TD:7720 ft.True Vertical PB depth:7710 ft.
Top PZ Location:Sec:31 Twp: 5N 65WFootage: 615 FSL  1856 FWL
Bottom Hole Location:Sec:31 Twp: 5N 65WFootage: 615 FSL  1856 FWL
Log Types:CD/CN/DIL, MUD, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 457 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 457 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8093 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 805, Top: 1310 ft., Bottom: 8093 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3790 ft.3940 ft.NN
SUSSEX4486 ft.4744 ft.NN
NIOBRARA7154 ft.7433 ft.NN
FORT HAYS7433 ft.7467 ft.NN
CODELL7467 ft.7486 ft.NN
J SAND7933 ft.8061 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/24/2009                 Interval Top: 7468 ft.    Interval Bottom: 7478 ft.

 Completed Information for Formation CODELL
1st Production Date:2/12/2009Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/16/2008
Treatment Summary:FRAC W/ 125,412 GAL W/ 270,360# 30/50 (12/16/08). SLF 80,430 GALS.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7468 ft.# Of Holes:40
Interval Bottom:7478 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/28/2023                Interval Top: 7167 ft.    Interval Bottom: 7478 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:2/12/2009Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/24/2009
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7457 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/24/2009Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 91
BTU_GAS 1243
CALC_BBLS_H2O 0
CALC_BBLS_OIL 91
CALC_GOR 12934
CALC_MCF_GAS 1177
CASING_PRESS 3300
GRAVITY_OIL 59
MCF_GAS 1177
Perforation Data:
Interval Top:7167 ft.# Of Holes:
Interval Bottom:7478 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/24/2009                 Interval Top: 7167 ft.    Interval Bottom: 7358 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:2/12/2009Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/16/2008
Treatment Summary:'A' BENCH (7167-7177): W/ 81,060 GALS W/ 8,000# 12/20 SBXL & 119,380# 30/50 (12/17/08). SLF 45,066 GALS. 'B' (7288-7298) & 'C' (7348-7358) BENCH: FRAC W/ 169,302 GAL W/ 12,000# 12/20 SBXL & 236,640# 30/50 (12/16/08). SLF 93,282 GALS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7167 ft.# Of Holes:
Interval Bottom:7358 ft.Hole Size:0.7 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/28/2023
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No