|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 3/13/2024 Measured TD: 7750 ft. Vertical TD: 7693 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 3/13/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20081131 | Expiration Date: | 6/1/2009 | | Proposed Top PZ Location: | Sec:31 Twp: 5N 65W | Footage: 2031 FSL 1913 FWL | | Bottom Hole Location: | Sec:31 Twp: 5N 65W | Footage: 2031 FSL 1913 FWL | | Proposed Depth/Form: | 7718 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | VALLEY CONNELL | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 160, Drill Unit: S2 31 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 318, Unit Acreage: 80, Drill Unit: E2SW4 |
| | |
| Wellbore Completed | | Completion Date: | 8/27/2008 | | Spud Date: | 8/22/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7750 ft. | Measured PB depth: | 7741 ft. | | True Vertical TD: | 7693 ft. | True Vertical PB depth: | 7683 ft. | | Top PZ Location: | Sec:31 Twp: 5N 65W | Footage: 2031 FSL 1913 FWL | | Bottom Hole Location: | Sec:31 Twp: 5N 65W | Footage: 2031 FSL 1913 FWL | | Log Types: | CN/CD/DIL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 461 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 0 ft., Bottom: 461 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7744 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 390 ft., Bottom: 7744 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3654 ft. | 3745 ft. | N | N | | SUSSEX | 4300 ft. | 4475 ft. | N | N | | NIOBRARA | 6835 ft. | 7128 ft. | N | N | | FORT HAYS | 7128 ft. | 7150 ft. | N | N | | CODELL | 7150 ft. | 7170 ft. | N | N | | J SAND | 7614 ft. | 7669 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 2/24/2009 Interval Top: 7152 ft. Interval Bottom: 7162 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/12/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/18/2008 | | Treatment Summary: | FRAC W/ 133,686AL W/ 270,540# 30/50 (12/21/08). SLF 88,704 GALS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7152 ft. | # Of Holes: | 40 | | Interval Bottom: | 7162 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 3/13/2024 Interval Top: 6849 ft. Interval Bottom: 7162 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/12/2009 | Choke Size: | 0.188 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/24/2009 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/24/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 35 | | BTU_GAS | 1243 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 35 | | CALC_GOR | 23371 | | CALC_MCF_GAS | 818 | | CASING_PRESS | 3400 | | GRAVITY_OIL | 58 | | MCF_GAS | 818 |
| | Perforation Data: | | Interval Top: | 6849 ft. | # Of Holes: | | | Interval Bottom: | 7162 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 2/24/2009 Interval Top: 6849 ft. Interval Bottom: 7041 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/12/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/18/2008 | | Treatment Summary: | 'A' BENCH (6849-6859); FRAC W/ 83,850 GAL W/ 8,000# 12/20 SBXL & 117,500# 30/50. SLF 47,586 GALS. 'B' (6971-6981) & 'C' (7031-7041) BENCHES: FRAC W/ 168,252 GAL W/ 12,000# 12/20 SBXL & 238,360# 30/50 (12/18/08). SLF 92,232 GALS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6849 ft. | # Of Holes: | 4 | | Interval Bottom: | 7041 ft. | Hole Size: | 0.7 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/13/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|