Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26668
Well Classification: OW Status: SI - 7/1/2023
Well Name/No:BINDER #20-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date7/1/2023
FacilityID:294020LocationID:310609
County:WELD #123Location:NWSE 28 5N67W 6
Field:WATTENBERG - #90750Elevation:4876 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1377FSL  1651 FELLat/Long: 40.367200 / -104.894090Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.367194 / -104.894097Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 7/1/2023             Measured TD: 7239 ft.    Vertical TD: 7220 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 7/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20076011 Expiration Date:12/18/2008
Proposed Top PZ Location:Sec:28 Twp: 5N 67W Footage: 1327 FSL  1314 FEL
Bottom Hole Location:Sec:28 Twp: 5N 67W Footage: 1327 FSL  1314 FEL
Proposed Depth/Form:7348 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE/4

Wellbore Completed
Completion Date:1/27/2008
Spud Date:1/21/2008Spud Date Is:ACTUAL
Measured TD:7239 ft.Measured PB depth:7198 ft.
True Vertical TD:7220 ft.True Vertical PB depth:7179 ft.
Top PZ Location:Sec:28 Twp: 5N 67WFootage: 1327 FSL  1314 FEL
Bottom Hole Location:Sec:28 Twp: 5N 67WFootage: 1327 FSL  1314 FEL
Log Types:CBL, DIL/GL/GR, CDL/CNL/ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 637 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 637 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7230 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 557, Top: 2270 ft., Bottom: 7230 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3404 ft.3754 ft.NN
SUSSEX4030 ft.4246 ft.NN
SHANNON4507 ft.4610 ft.NN
TEEPEE BUTTES5958 ft.NN
NIOBRARA6742 ft.NN
FORT HAYS7052 ft.NN
CODELL7074 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/12/2008                 Interval Top: 7072 ft.    Interval Bottom: 7092 ft.

 Completed Information for Formation CODELL
1st Production Date:4/8/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/12/2008
Treatment Summary:196,000 GALS FLUID & 4000# 20/40 SAND & 150,000# 40/70 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7072 ft.# Of Holes:60
Interval Bottom:7092 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 7/1/2023                  Interval Top: 6750 ft.    Interval Bottom: 7092 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:4/8/2008Choke Size:0.188 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/27/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2008Test Method:FLOWING
Hours Tested:Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1296
CALC_BBLS_H2O 0
CALC_BBLS_OIL 47
CALC_GOR 2680
CALC_MCF_GAS 126
CASING_PRESS 277
GRAVITY_OIL 51
Perforation Data:
Interval Top:6750 ft.# Of Holes:180
Interval Bottom:7092 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/12/2008                 Interval Top: 6750 ft.    Interval Bottom: 6956 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/8/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/12/2008
Treatment Summary:248,000 GAL FLUID & 4600# 20/40 SAND & 200,000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6750 ft.# Of Holes:120
Interval Bottom:6956 ft.Hole Size:0.42 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY01/27/2026
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2023
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No