|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/6/2021 Measured TD: 7295 ft. Vertical TD: 7272 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/6/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20075560 | Expiration Date: | 11/29/2008 | | Proposed Top PZ Location: | Sec:28 Twp: 6N 67W | Footage: 595 FSL 1970 FWL | | Bottom Hole Location: | Sec:28 Twp: 6N 67W | Footage: 595 FSL 1970 FWL | | Proposed Depth/Form: | 7777 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 |
| | |
| Wellbore Completed | | Completion Date: | 2/9/2008 | | Spud Date: | 2/3/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 7295 ft. | Measured PB depth: | 7244 ft. | | True Vertical TD: | 7272 ft. | True Vertical PB depth: | 7221 ft. | | Top PZ Location: | Sec:28 Twp: 6N 67W | Footage: 595 FSL 1970 FWL | | Bottom Hole Location: | Sec:28 Twp: 6N 67W | Footage: 595 FSL 1970 FWL | | Log Types: | CBL, MUD, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 680 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 680 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7277 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 890, Top: 730 ft., Bottom: 7277 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3424 ft. | | N | N | | SUSSEX | 4050 ft. | | N | N | | SHANNON | 4522 ft. | | N | N | | NIOBRARA | 6814 ft. | | N | N | | FORT HAYS | 7123 ft. | | N | N | | CODELL | 7142 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 7/8/2008 Interval Top: 7144 ft. Interval Bottom: 7158 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/20/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/10/2008 | | Treatment Summary: | 169,500 GALS FLUID & 115,000 LBS 30/50 SAND & 4000 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7144 ft. | # Of Holes: | 56 | | Interval Bottom: | 7158 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/6/2021 Interval Top: 6828 ft. Interval Bottom: 7158 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/9/2008 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1316 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 72 | | CALC_GOR | 1070 | | CALC_MCF_GAS | 77 | | CASING_PRESS | 1550 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 1600 |
| | Perforation Data: | | Interval Top: | 6828 ft. | # Of Holes: | 180 | | Interval Bottom: | 7158 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/8/2008 Interval Top: 6828 ft. Interval Bottom: 7036 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/20/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/10/2008 | | Treatment Summary: | 381,350 GALS FLUID & 296,000 LBS 30/50 SAND & 8000 LBS 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6828 ft. | # Of Holes: | 124 | | Interval Bottom: | 7036 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/06/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|