Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26558
Well Classification: OW Status: PA - 10/15/2019
Well Name/No:DACONO STATE #11-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:72/2841 S
Facility Status:PAStatus Date10/15/2019
FacilityID:293447LocationID:336485
Municipality/County:FREDERICK / WELD #123Location:NESW 36 2N68W 6
Field:WATTENBERG - #90750Elevation:5022 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2015FSL  1867 FWLLat/Long: 40.093230 / -104.954470Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.093231 / -104.954461Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/19/2013
End Date: 9/19/2013
Reported: 10/31/2013
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/15/2019             Measured TD: 7900 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/15/2019
Wellbore PermitDRIFTED
Permit #:20081260 Expiration Date:4/17/2009
Proposed Top PZ Location:Sec: Twp: Footage: 2130 FSL  1980 FWL
Bottom Hole Location:Sec:36 Twp: 2N 68W Footage: 2130 FSL  1980 FWL
Proposed Depth/Form:7882 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: E/2SW4

Wellbore Completed
Completion Date:9/29/2008
Spud Date:9/24/2008Spud Date Is:ACTUAL
Measured TD:7900 ft.Measured PB depth:7857 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL,CDL/CNL/ML,DIL/GL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 907 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 907 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7887 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 732, Top: 3400 ft., Bottom: 7887 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4156 ft.NN
SUSSEX4608 ft.NN
SHANNON5076 ft.NN
NIOBRARA7422 ft.NN
FORT HAYS7705 ft.NN
CODELL7727 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/14/2013                Interval Top: 7730 ft.    Interval Bottom: 7750 ft.

 Completed Information for Formation CODELL
1st Production Date:12/8/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/19/2013Treatment End Date:9/19/2013
Treatment Summary:CODELL REFRAC 4779 BBL SLICKWATER, 4779 BBL TOTAL FLUID. 150000# 40/70 SAND, 4000# 20/40 SAND, 154000# TOTAL SAND.
Total fluid used in treatment (bbls):4779Max pressure during treatment (psi):5613
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.81
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):109
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):154000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/4/2008
Treatment Summary:179,000 GALS FLUID & 114,000 LBS 40/70 SAND & 4,000 LBS 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7730 ft.# Of Holes:60
Interval Bottom:7750 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/15/2019                Interval Top: 7506 ft.    Interval Bottom: 7750 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/8/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/29/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7700 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/6/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 9
BTU_GAS 1321
CALC_BBLS_OIL 9
CALC_GOR 11888
CALC_MCF_GAS 107
CASING_PRESS 596
GRAVITY_OIL 49
MCF_GAS 107
TUBING_PRESS 577
Perforation Data:
Interval Top:7506 ft.# Of Holes:120
Interval Bottom:7750 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 1/15/2009                 Interval Top: 7506 ft.    Interval Bottom: 7607 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/8/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2008
Treatment Summary:500 GALS ACID & 60,000 GALS CLAY FIX & 100,000 GALS FLUID & 249,000 LBS 20/40 SAND & 4,000 LBS 20/40 R/C SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7506 ft.# Of Holes:60
Interval Bottom:7607 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/15/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No