|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/26/2022 Measured TD: 8391 ft. Vertical TD: 8297 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/26/2022 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/30/2012 | Proposed Top PZ Location: | Sec:36 Twp: 2N 68W | Footage: 113 FSL 1342 FEL | Bottom Hole Location: | Sec:36 Twp: 2N 68W | Footage: 123 FSL 1335 FEL | Proposed Depth/Form: | 8391 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | STATE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 160, Drill Unit: GWA | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 889 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 0 ft., Bottom: 889 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8379 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 617, Top: 3564 ft., Bottom: 8379 ft. |
| | |
Wellbore Completed | Completion Date: | 7/20/2008 | Spud Date: | 7/14/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8391 ft. | Measured PB depth: | 8349 ft. | True Vertical TD: | 8297 ft. | True Vertical PB depth: | 8255 ft. | Top PZ Location: | Sec:36 Twp: 2N 68W | Footage: 113 FSL 1342 FEL | Bottom Hole Location: | Sec:36 Twp: 2N 68W | Footage: 113 FSL 1342 FEL | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 889 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 889 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8379 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 617, Top: 3564 ft., Bottom: 8379 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4200 ft. | | N | N | SUSSEX | 4722 ft. | | N | N | SHANNON | 5168 ft. | | N | N | NIOBRARA | 7477 ft. | | N | N | FORT HAYS | 7763 ft. | | N | N | CODELL | 7785 ft. | | N | N | J SAND | 8213 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 8/2/2010 Interval Top: 7786 ft. Interval Bottom: 7806 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/24/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/17/2008 | Treatment Summary: | 171,000 GALS FLUID & 113,000 LBS 40/70 SAND & 4,000 LBS 20/40 SUPER LC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7786 ft. | # Of Holes: | 60 | Interval Bottom: | 7806 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/26/2022 Interval Top: 7474 ft. Interval Bottom: 7806 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/24/2008 | Choke Size: | 0.250 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/20/2008 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/24/2009 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1138 | CALC_BBLS_OIL | 22 | CALC_GOR | 3000 | CALC_MCF_GAS | 66 | CASING_PRESS | 300 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7474 ft. | # Of Holes: | 180 | Interval Bottom: | 7806 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/2/2010 Interval Top: 7474 ft. Interval Bottom: 7662 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/24/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/18/2008 | Treatment Summary: | 1250 GALS ACID & 276,000 GALS FLUID & 375,000 LBS 30/50 SAND & 8,000 LBS 20/40 SUPER LC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7474 ft. | # Of Holes: | 120 | Interval Bottom: | 7662 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 09/26/2022 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|