|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/10/2018 Measured TD: 8293 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/10/2018 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/30/2012 | | Proposed Depth/Form: | 8293 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | STATE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: W/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: W/2SW | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 908 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 908 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8280 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 797, Top: 3480 ft., Bottom: 8280 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/3/2008 | | Spud Date: | 7/28/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8293 ft. | Measured PB depth: | 8250 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, DIL/GL/GR, CDL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 908 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 670, Top: 0 ft., Bottom: 908 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8280 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 797, Top: 3480 ft., Bottom: 8280 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4098 ft. | 4154 ft. | N | N | | SUSSEX | 4560 ft. | 4809 ft. | N | N | | SHANNON | 5070 ft. | 5112 ft. | N | N | | NIOBRARA | 7398 ft. | | N | N | | FORT HAYS | 7680 ft. | | N | N | | CODELL | 7700 ft. | | N | N | | J SAND | 8125 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 11/14/2013 Interval Top: 7702 ft. Interval Bottom: 7722 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/8/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/20/2013 | Treatment End Date: | 9/20/2013 | | Treatment Summary: | CODELL REFRAC
4744 BBL SLICKWATER, 4744 BBL TOTAL FLUID.
149220# 40/70 SAND, 4000# 20/40 SAND, 153220# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 4744 | Max pressure during treatment (psi): | 4809 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 49 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 153220 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 8/28/2008 | | Treatment Summary: | 172,494 GALS FLUID & 116,020 LBS 40/70 SAND & 4000 LBS OF 20/40 SB EXCEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7702 ft. | # Of Holes: | 60 | | Interval Bottom: | 7722 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/10/2018 Interval Top: 7476 ft. Interval Bottom: 7722 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/8/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/3/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7657 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/13/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | BTU_GAS | 1321 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 12800 | | CALC_MCF_GAS | 64 | | CASING_PRESS | 702 | | GRAVITY_OIL | 49 | | MCF_GAS | 64 | | TUBING_PRESS | 653 |
| | Perforation Data: | | Interval Top: | 7476 ft. | # Of Holes: | 160 | | Interval Bottom: | 7722 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/2/2010 Interval Top: 7476 ft. Interval Bottom: 7572 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/8/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/28/2008 | | Treatment Summary: | 500 GALS ACID & 332710 GALS FLUID & 255320 LBS 40/70 SAND & 8000 LBS OF 20/40 SUPER LC |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7476 ft. | # Of Holes: | 100 | | Interval Bottom: | 7572 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/10/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|