Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26424
Well Classification: OW Status: PA - 10/30/2018
Well Name/No:KAISER #21-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/30/2018
FacilityID:292931LocationID:310453
County:WELD #123Location:NENW 10 6N65W 6
Field:WATTENBERG - #90750Elevation:4788 ft.
Planned Location:682FNL  1986 FWLLat/Long: 40.506660 / -104.651750Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.506640 / -104.651590Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/30/2018             Measured TD: 7364 ft.    Vertical TD: 7360 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/30/2018
Wellbore PermitDRIFTED
Permit #:20075099 Expiration Date:10/14/2008
Prop Depth/Form:7300 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NW

Wellbore Completed
Completion Date:11/12/2007
Spud Date:11/7/2007Spud Date Is:ACTUAL
Measured TD:7364 ft.Measured PB depth:7311 ft.
True Vertical TD:7360 ft.True Vertical PB depth:
Log Types:COMP DENSITY/COMP NUETRON/DUAL INDUCTION (TRIPLE COMBO), CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 585 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 585 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7311 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 3515 ft., Bottom: 7311 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3939 ft.4100 ft.NN
SUSSEX4448 ft.4625 ft.NN
SHANNON5041 ft.5792 ft.NN
NIOBRARA6822 ft.6955 ft.NN
FORT HAYS7092 ft.7102 ft.NN
CODELL7115 ft.7130 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 10/1/2016                 Interval Top: 7115 ft.    Interval Bottom: 7129 ft.

 Completed Information for Formation CODELL
1st Production Date:12/10/2007Choke Size:0.156 in.
Formation Name:CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/6/2007
Treatment Summary:CUDD ENERGY SERVICES PERFORMED SLICK WATER FRAC ON CODL FORMATION W/174 GAL OF FR-3, 261 GAL OF MNE-88, 173 GAL OF MCS-55, 96 GAL OF NE-20 & 22 LBS OF B-26 USING 78,300# OF 30/50 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/10/2007Test Method:FLOWING
Hours Tested:18Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 45
BBLS_OIL 88
BTU_GAS 1256
CALC_GOR 1981
CASING_PRESS 1500
GRAVITY_OIL 52
MCF_GAS 175
Perforation Data:
Interval Top:7115 ft.# Of Holes:56
Interval Bottom:7129 ft.Hole Size:3.125 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/30/2018                Interval Top: 6930 ft.    Interval Bottom: 7129 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/12/2011Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:7103 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6930 ft.# Of Holes:160
Interval Bottom:7129 ft.Hole Size:

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 10/1/2016                 Interval Top: 6930 ft.    Interval Bottom: 6956 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/27/2010Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/13/2010
Treatment Summary:PERFORATED NIOBRARA "B", 4 SPF, FRACTURE STIMULATED WITH 196,836 GAL SLICKWATER AND 120,020# 30/50 SAND.
Tubing Size:2.375 in.Tubing Setting Depth:6920 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/25/2010Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 20
BTU_GAS 1283
CALC_GOR 2000
CASING_PRESS 1520
GRAVITY_OIL 46
MCF_GAS 40
TUBING_PRESS 1350
Perforation Data:
Interval Top:6930 ft.# Of Holes:104
Interval Bottom:6956 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No