Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26379
Well Classification: OW Status: PA - 6/25/2025
Well Name/No:SCOTT #32-14
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/25/2025
FacilityID:292762LocationID:310416
County:WELD #123Location:SENE 32 7N64W 6
Field:GALETON - #27930Elevation:4819 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1745FNL  452 FELLat/Long: 40.531780 / -104.566480Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.531760 / -104.566460Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 6/25/2025             Measured TD: 7264 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 6/25/2025
Wellbore Permit
Permit #:20074307 Expiration Date:10/2/2008
Proposed Depth/Form:7300 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NE

Wellbore Completed
Completion Date:5/23/2008
Spud Date:5/17/2008Spud Date Is:ACTUAL
Measured TD:7264 ft.Measured PB depth:7206 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SONIC BOND/GR, COMP DENS&NEUTRN/GR, DUAL IND./GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 643 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 245, Top: 0 ft., Bottom: 643 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7246 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1172, Top: 590 ft., Bottom: 7246 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3769 ft.4151 ft.NN
SUSSEX4506 ft.4707 ft.NN
SHANNON5121 ft.5211 ft.NN
NIOBRARA6775 ft.7051 ft.NN
CODELL7098 ft.7114 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/31/2024                Interval Top: 7099 ft.    Interval Bottom: 7112 ft.

 Completed Information for Formation CODELL
1st Production Date:7/1/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/13/2008
Treatment Summary:FRAC'D CODL W/248,580# 30/50 SAND USING 81,673 GALS 26# SILVERSTIM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7099 ft.# Of Holes:52
Interval Bottom:7112 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 6/25/2025                 Interval Top: 6920 ft.    Interval Bottom: 7112 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/1/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2008
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 94
BTU_GAS 1239
CALC_GOR 3085
CASING_PRESS 1525
GRAVITY_OIL 45
MCF_GAS 290
TUBING_PRESS 800
Perforation Data:
Interval Top:6920 ft.# Of Holes:132
Interval Bottom:7112 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/31/2024                Interval Top: 6920 ft.    Interval Bottom: 6940 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/1/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/18/2008
Treatment Summary:FRAC'D NBRR W/ 244,271# 30/50 & 12,000# SB EXCEL SAND USING 92,737 GALS 26# SILVERSTIM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6920 ft.# Of Holes:80
Interval Bottom:6940 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/25/2025
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No