Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26360
Well Classification: OW Status: PA - 10/21/2019
Well Name/No:DACONO STATE #7-36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:72/2841S
Facility Status:PAStatus Date10/21/2019
FacilityID:292463LocationID:336507
Municipality/County:FREDERICK / WELD #123Location:SWNE 36 2N68W 6
Field:WATTENBERG - #90750Elevation:5010 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2028FNL  1965 FELLat/Long: 40.096690 / -104.949280Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.096678 / -104.949275Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/11/2013
End Date: 9/11/2013
Reported: 10/30/2013
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/17/2019             Measured TD: 7870 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/17/2019
Wellbore Permit
Permit #:20081262 Expiration Date:4/17/2009
Proposed Depth/Form:7850 ft.
Surface Mineral Owner Same:No
Mineral Owner:STATESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 40 , Unit Acreage: 80, Drill Unit: W/2NE

Wellbore Completed
Completion Date:9/9/2008
Spud Date:9/4/2008Spud Date Is:ACTUAL
Measured TD:7870 ft.Measured PB depth:7819 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, HVL, MRL, CPD/DSN
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 570, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7853 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 472, Top: 4520 ft., Bottom: 7853 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN4134 ft.NN
SUSSEX4532 ft.NN
SHANNON5072 ft.NN
TEEPEE BUTTES6472 ft.NN
NIOBRARA7398 ft.NN
FORT HAYS7676 ft.NN
CODELL7698 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/13/2013                Interval Top: 7706 ft.    Interval Bottom: 7726 ft.

 Completed Information for Formation CODELL
1st Production Date:12/24/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/11/2013Treatment End Date:9/11/2013
Treatment Summary:CODELL REFRAC 4682 BBL SLICKWATER, 4682 BBL TOTAL FLUID. 150700# 40/70 SAND, 4000# 20/40 SAND, 154700# TOTAL SAND.
Total fluid used in treatment (bbls):4682Max pressure during treatment (psi):4925
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):279
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):154700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/1/2008
Treatment Summary:165,257 GALS FLUID & 116,060# 40/70 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7706 ft.# Of Holes:60
Interval Bottom:7726 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/21/2019                Interval Top: 7487 ft.    Interval Bottom: 7726 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:12/24/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/9/2008
Treatment Summary:
Tubing Size:2.375 in.Tubing Setting Depth:7668 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1237
CALC_BBLS_H2O 0
CALC_BBLS_OIL 57
CALC_GOR 2965
CALC_MCF_GAS 10
CASING_PRESS 1026
GRAVITY_OIL 51
MCF_GAS 10
TUBING_PRESS 960
Perforation Data:
Interval Top:7487 ft.# Of Holes:120
Interval Bottom:7726 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 12/24/2008                Interval Top: 7487 ft.    Interval Bottom: 7576 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:12/24/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/2/2008
Treatment Summary:1000 GALS ACID & 248,766 GALS FLUID & 201,180# 40/70 SAND & 4,000# 20/40 SB EXCEL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7487 ft.# Of Holes:60
Interval Bottom:7576 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/21/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No