|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 6/18/2024 Measured TD: 8151 ft. Vertical TD: 7987 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 6/18/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | 20074099 | Expiration Date: | 9/26/2008 | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 652 FNL 658 FEL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 652 FNL 658 FEL | Proposed Depth/Form: | 8141 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE4 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/1/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8151 ft. | Measured PB depth: | 8103 ft. | True Vertical TD: | 7987 ft. | True Vertical PB depth: | 7940 ft. | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 652 FNL 658 FEL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 652 FNL 658 FEL | Log Types: | SBL, DIL/GL/GR, CDL/CNL/ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 725 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 460, Top: 0 ft., Bottom: 725 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8137 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 779, Top: 3180 ft., Bottom: 8137 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3180 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 560, Top: 0 ft., Bottom: 3180 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3812 ft. | 4020 ft. | N | N | SUSSEX | 4383 ft. | 4446 ft. | N | N | SHANNON | 4858 ft. | 4880 ft. | N | N | NIOBRARA | 7298 ft. | | N | N | FORT HAYS | 7530 ft. | | N | N | CODELL | 7552 ft. | 7575 ft. | N | N | J SAND | 7979 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 7/18/2007 Interval Top: 7554 ft. Interval Bottom: 7570 ft. Completed Information for Formation CODELL | 1st Production Date: | 9/25/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/24/2008 | Treatment Summary: | 201,993 GALS FLUID & 145,520# 40/70 SAND & 4,000# 20/40 AC FRAC CR |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7554 ft. | # Of Holes: | 64 | Interval Bottom: | 7570 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/18/2024 Interval Top: 7324 ft. Interval Bottom: 7570 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 9/25/2008 | Choke Size: | 0.156 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/7/2008 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1292 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 23 | CALC_GOR | 1305 | CALC_MCF_GAS | 30 | CASING_PRESS | 880 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7324 ft. | # Of Holes: | 124 | Interval Bottom: | 7570 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/18/2007 Interval Top: 7324 ft. Interval Bottom: 7430 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 9/25/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/24/2008 | Treatment Summary: | 259,115 GALS FLUID & 190,751# 40/70 SAND & 4,000# 20/40 AC FRAC CR |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7324 ft. | # Of Holes: | 60 | Interval Bottom: | 7430 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 06/18/2024 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|