Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26279
Well Classification: OW Status: PA - 7/19/2022
Well Name/No:GUTTERSEN #31-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/19/2022
FacilityID:292275LocationID:310346
County:WELD #123Location:NWNE 13 3N64W 6
Field:WATTENBERG - #90750Elevation:4740 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:664FNL  1973 FELLat/Long: 40.230720 / -104.497220Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.230734 / -104.497236Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/19/2012
End Date: 7/19/2012
Reported: 6/25/2013
Originally Reported: 11/6/2012
Days to report: 341
Days to report: 110
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/19/2022             Measured TD: 7740 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/19/2022
Wellbore Permit
Permit #:20073907 Expiration Date:9/16/2008
Proposed Depth/Form:7625 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2NE
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 3950 ft., Bottom: 4700 ft.

Wellbore Completed
Completion Date:N/A
Spud Date:11/25/2007Spud Date Is:ACTUAL
Measured TD:7740 ft.Measured PB depth:7670 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 661 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 470, Top: 0 ft., Bottom: 661 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7724 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 3024 ft., Bottom: 7724 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 3024 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 645, Top: 100 ft., Bottom: 3024 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6527 ft.NN
FORT HAYS6775 ft.NN
CODELL6798 ft.NN
J SAND7258 ft.NN
DAKOTA7476 ft.NN
LAKOTA7550 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 5/21/2013                 Interval Top: 6800 ft.    Interval Bottom: 6808 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6800 ft.# Of Holes:24
Interval Bottom:6808 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/19/2022                 Interval Top: 6531 ft.    Interval Bottom: 6808 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/28/2008
Treatment Summary:NOBRARA 6586'-6592' (18 HOLES) AND CODELL 6801'-6807' (18 HOLES) FRAC'D NIOBRARA/CODELL WITH 24 BBLS OF 15% HCL, 1062 BBLS OF SLICKWATER PAD, 959 BBLS OF VISTAR 20# PAD, --SEE OPERATORS COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 1
BTU_GAS 1330
CALC_BBLS_H2O 1
CALC_BBLS_OIL 1
CALC_GOR 13
CALC_MCF_GAS 13
CASING_PRESS 471
GRAVITY_OIL 47
MCF_GAS 13
TUBING_PRESS 417
Perforation Data:
Interval Top:6531 ft.# Of Holes:52
Interval Bottom:6808 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 5/21/2013                 Interval Top: 6531 ft.    Interval Bottom: 6592 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/20/2012Treatment End Date:7/20/2012
Treatment Summary:Nio Bench "A" 6531-6533 Nio Bench "B" 6581-6589
Total fluid used in treatment (bbls):4065Max pressure during treatment (psi):4883
Total gas used in treatment (mcf):Fluid density (lbs/gal):20.00
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):4041Disposition method For flowback:DISPOSAL
Total proppant used (lbs):251050Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6531 ft.# Of Holes:64
Interval Bottom:6592 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/19/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No