Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26276
Well Classification: OW Status: PA - 7/19/2022
Well Name/No:GUTTERSEN #32-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/19/2022
FacilityID:292278LocationID:310343
County:WELD #123Location:SWNE 13 3N64W 6
Field:WATTENBERG - #90750Elevation:4750 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1887FNL  1850 FELLat/Long: 40.227390 / -104.496810Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.227379 / -104.496821Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/19/2022             Measured TD: 7714 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/19/2022
Wellbore Permit
Permit #:20073908 Expiration Date:9/16/2008
Proposed Depth/Form:7625 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2NE
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 80, Drill Unit: W2NE
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 4700 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 125, Top: 3950 ft., Bottom: 4700 ft.

Wellbore Completed
Completion Date:12/8/2007
Spud Date:12/2/2007Spud Date Is:ACTUAL
Measured TD:7714 ft.Measured PB depth:7662 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 678 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 678 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7696 ft., Weight: 12.6 , Citings Type: ACTUAL
Cement:Sacks: 340, Top: 6100 ft., Bottom: 7696 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4613 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 3250 ft., Bottom: 4613 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6524 ft.NN
FORT HAYS6768 ft.NN
CODELL6791 ft.NN
J SAND7254 ft.NN
DAKOTA7469 ft.NN
LAKOTA7545 ft.NN

Formation LKTA                     Formation Classification:  GW                     Status:  AB - 4/3/2008                  Interval Top: 7558 ft.    Interval Bottom: 7568 ft.

 Completed Information for Formation LAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:LAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/8/2007
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation LKTA.
Perforation Data:
Interval Top:7558 ft.# Of Holes:30
Interval Bottom:7568 ft.Hole Size:0.39 in.

Formation DKTA                     Formation Classification:  GW                     Status:  AB - 8/22/2008                 Interval Top: 7472 ft.    Interval Bottom: 7494 ft.

 Completed Information for Formation DAKOTA
1st Production Date:4/24/2008Choke Size:0.640 in.
Formation Name:DAKOTACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/9/2008
Treatment Summary:DAKOTA PERFS 7472'-7476' (8 HOLES), 7486'-7494' (16 HOLES) FRAC'D DAKOTA USING 271 BBLS VISTAR 20# PAD, 625 BBLS OF VISTAR 20# FLUID SYSTEM, 49460 LBS OF 20/40 WHITE SAND, 8000 LBS OF SB EXCEL 20/40 RESIN COATED PROPPANT AND 3040 LBS OF 100 MESH PROPPAN
Tubing Size:2.375 in.Tubing Setting Depth:7456 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2008Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1005
CALC_MCF_GAS 13
CASING_PRESS 1100
MCF_GAS 13
TUBING_PRESS 800
Perforation Data:
Interval Top:7472 ft.# Of Holes:24
Interval Bottom:7494 ft.Hole Size:0.39 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/19/2022                 Interval Top: 6577 ft.    Interval Bottom: 6800 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/30/2008Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:8/27/2008
Treatment Summary:NIOBRARA 6577'-6583' (18 HOLES) AND CODELL 6794'-6800' (18 HOLES) FRAC'D NIOBRARA/CODELL WITH 24 BBLS OF 15% HCL, 1057 BBLS OF SLICKWATER PAD, 954 BBLS OF VISTAR 20# PAD, --SEE OPERATORS COMMENTS
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 50
BTU_GAS 1341
CALC_BBLS_H2O 6
CALC_BBLS_OIL 50
CALC_GOR 2480
CALC_MCF_GAS 124
CASING_PRESS 1050
GRAVITY_OIL 48
MCF_GAS 124
TUBING_PRESS 750
Perforation Data:
Interval Top:6577 ft.# Of Holes:36
Interval Bottom:6800 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/19/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No