|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/11/2022 Measured TD: 7432 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/11/2022 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 5/24/2014 | | Proposed Depth/Form: | 7432 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE4 | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 449-15 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W2SE | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2SE4 | | Formation And Spacing: | Code: SX-SN , Formation: SUSSEX-SHANNON , Order: 493-2 , Unit Acreage: 80, Drill Unit: W2SE |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 10/14/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7432 ft. | Measured PB depth: | 7634 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DIL, CDL, CNL, GR, VDL/CBL | | Log Types: | CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 675 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 665 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7414 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 6100 ft., Bottom: 7414 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4591 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 3760 ft., Bottom: 4591 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3600 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 730 ft., Bottom: 3600 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3590 ft. | | N | N | | SUSSEX | 4160 ft. | | N | N | | NIOBRARA | 6604 ft. | | N | N | | FORT HAYS | 6785 ft. | | N | N | | CODELL | 6808 ft. | | N | N | | J SAND | 7269 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 6/27/2012 Interval Top: 7272 ft. Interval Bottom: 7300 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/21/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/11/2008 | | Treatment Summary: | JSAND PERFS 7272-7274' (4 HOLES), 7292-7300' (16 HOLES);619 BBLS VISTAR 20# PAD; 15% N2 ASSIST; 1070 BBLS VISTAR 20# FLUID SYSTEM; 149,960 LBS 20/40 WHITE SAND; 4,000 LBS SR EXCEL 20/40 PROPPANT; 486 MSCF N2. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 12 | | BBLS_OIL | 1 | | BTU_GAS | 1279 | | CALC_GOR | 229000 | | CASING_PRESS | 1275 | | GRAVITY_OIL | 48 | | MCF_GAS | 229 | | TUBING_PRESS | 1175 |
| | Perforation Data: | | Interval Top: | 7272 ft. | # Of Holes: | 20 | | Interval Bottom: | 7300 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: OW Status: CM - 11/8/2012 Interval Top: 6810 ft. Interval Bottom: 6818 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 3/21/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/11/2012 | Treatment End Date: | 7/11/2012 | | Treatment Summary: | 217000 lbs Ottawa, 8000 lbs Super LC 20/40. RD BHI. MTP = 4590 psi, ATP = 4013 psi, AIR = 24.8 bpm. Pressure response was slightly positive for entire treatment. | | Total fluid used in treatment (bbls): | 2609 | Max pressure during treatment (psi): | 4590 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 20.00 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 2609 | Disposition method For flowback: | | | Total proppant used (lbs): | 250000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7210 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 6810 ft. | # Of Holes: | 24 | | Interval Bottom: | 6818 ft. | Hole Size: | 0.40625 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 7/11/2022 Interval Top: 6613 ft. Interval Bottom: 6818 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7210 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/24/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 9 | | BBLS_OIL | 9 | | BTU_GAS | 1377 | | CALC_BBLS_H2O | 9 | | CALC_BBLS_OIL | 9 | | CALC_GOR | 3444 | | CALC_MCF_GAS | 31 | | CASING_PRESS | 849 | | GRAVITY_OIL | 45 | | MCF_GAS | 31 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 6613 ft. | # Of Holes: | 56 | | Interval Bottom: | 6818 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 11/8/2012 Interval Top: 6613 ft. Interval Bottom: 6696 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/11/2012 | Treatment End Date: | 7/11/2012 | | Treatment Summary: | Niobrara "C" Bench @ 6688'-6696' (3 SPF) Niobrara "A" Bench @ 6613' - 6617' (2 SPF) 32 New holes 238000 lbs Ottawa 20/40 12000 20/40 Super LC. RD HES. MTP = 5077 psi, ATP = 4834 psi, AIR = 49.8 bpm. Pressure response was slightly positive for entire treatment.
| | Total fluid used in treatment (bbls): | 3696 | Max pressure during treatment (psi): | 5077 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 20.00 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 12 | | Fresh water used in treatment (bbls): | 3696 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 250000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6613 ft. | # Of Holes: | 32 | | Interval Bottom: | 6696 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/11/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|