Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26270
Well Classification: OW Status: PA - 7/11/2022
Well Name/No:GUTTERSEN #12D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date7/11/2022
FacilityID:292223LocationID:310338
County:WELD #123Location:SESE 12 3N64W 6
Field:WATTENBERG - #90750Elevation:4750 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1328FSL  1315 FELLat/Long: 40.236220 / -104.494860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.236190 / -104.494830Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/30/2012
End Date: 7/30/2012
Reported: 11/15/2012
Days to report: 108
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 7/11/2022             Measured TD: 7432 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 7/11/2022
Wellbore Permit
Permit #:20073827 Expiration Date:9/11/2008
Proposed Depth/Form:7650 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 449-15 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: S2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SE4
Formation And Spacing:Code: SX-SN , Formation: SUSSEX-SHANNON , Order: , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:10/27/2007
Spud Date:10/27/2007Spud Date Is:ACTUAL
Measured TD:7432 ft.Measured PB depth:7025 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL, CNL/CDL, DUAL INDUCTION
Log Types:CBL, Triple Combo
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 687 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 687 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7052 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 210, Top: 5800 ft., Bottom: 7052 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4767 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 3000 ft., Bottom: 4767 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 3000 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 648, Top: 120 ft., Bottom: 3000 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6599 ft.NN
FORT HAYS6819 ft.NN
CODELL6842 ft.NN
J SAND7263 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/9/2015                  Interval Top: 6846 ft.    Interval Bottom: 6854 ft.

 Completed Information for Formation CODELL
1st Production Date:8/21/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/30/2012Treatment End Date:7/30/2012
Treatment Summary:1 Stage Frac, 225,820 lbs of 20/40 sand, 113,148 bbls total
Total fluid used in treatment (bbls):2815Max pressure during treatment (psi):7278
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):121Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):245
Fresh water used in treatment (bbls):2694Disposition method For flowback:DISPOSAL
Total proppant used (lbs):225820Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6846 ft.# Of Holes:24
Interval Bottom:6854 ft.Hole Size:0.40625 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 7/11/2022                 Interval Top: 6622 ft.    Interval Bottom: 6854 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:12/7/2007
Treatment Summary:NBRR"A" 6624-6634'(10 HOLES) NBRR "B"6709-6711'(12 HOLES) & CODL 6846-6852'(12 HOLES) FRAC NB-CD W/1060 BBL SLICKWATER PAD, 847 BBL CROSSLINKED PAD, 3790 BBL VISTAR 20# FLD SYSTEM,354040 LBS 20/40 WHITE SND & 16000 LBS SUPER LC 20/40 RESIN COATED PROPPANT
Tubing Size:2.375 in.Tubing Setting Depth:6831 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/26/2012Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 8
BTU_GAS 1377
CALC_BBLS_H2O 5
CALC_BBLS_OIL 8
CALC_GOR 400
CALC_MCF_GAS 30
CASING_PRESS 1357
GRAVITY_OIL 47
MCF_GAS 30
TUBING_PRESS 711
Perforation Data:
Interval Top:6622 ft.# Of Holes:52
Interval Bottom:6854 ft.Hole Size:0.34 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/9/2015                  Interval Top: 6622 ft.    Interval Bottom: 6712 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/21/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/8/2012Treatment End Date:8/8/2012
Treatment Summary:perf NBRR "A" 6622-6630 (16 holes) re-perf NBRR "B" 6708-6712 (12 holes)
Total fluid used in treatment (bbls):3904Max pressure during treatment (psi):4982
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):1.01
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):245
Fresh water used in treatment (bbls):3880Disposition method For flowback:DISPOSAL
Total proppant used (lbs):252320Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6622 ft.# Of Holes:28
Interval Bottom:6712 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY07/11/2022
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No