|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 5/26/2020 Measured TD: 7605 ft. Vertical TD: 7431 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 5/26/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20073905 | Expiration Date: | 9/11/2008 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 1330 FSL 2585 FWL | | Bottom Hole Location: | Sec:26 Twp: 3N 68W | Footage: 1330 FSL 2585 FWL | | Proposed Depth/Form: | 7558 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-67 , Unit Acreage: 160, Drill Unit: GWA |
| | |
| Wellbore Completed | | Completion Date: | 11/12/2007 | | Spud Date: | 11/6/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7605 ft. | Measured PB depth: | 7559 ft. | | True Vertical TD: | 7431 ft. | True Vertical PB depth: | 7385 ft. | | Top PZ Location: | Sec:26 Twp: 3N 68W | Footage: 1327 FSL 2552 FWL | | Bottom Hole Location: | Sec:26 Twp: 3N 68W | Footage: 1327 FSL 2552 FWL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 779 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 640, Top: 0 ft., Bottom: 779 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7582 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 457, Top: 3850 ft., Bottom: 7582 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3792 ft. | | N | N | | SUSSEX | 4212 ft. | | N | N | | SHANNON | 4762 ft. | | N | N | | NIOBRARA | 7150 ft. | | N | N | | FORT HAYS | 7412 ft. | | N | N | | CODELL | 7434 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 4/7/2011 Interval Top: 7434 ft. Interval Bottom: 7454 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 4/9/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/24/2010 | | Treatment Summary: | 10/19/10 Set CIBP @ 7400' w/ sand cap for NB Recomplete
11/15/10 Drill and clean thru sand and CIBP to PB @ 7540
11/24/10 Commingle with NBRR production | | Formation Treatment | | Treatment Date: | 2/1/2008 | | Treatment Summary: | 189,000 GALS FLUID & 155,000# 40/70 SAND & 4000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1309 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 110 | | CALC_GOR | 850 | | CALC_MCF_GAS | 93 | | CASING_PRESS | 1491 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 1041 |
| | Perforation Data: | | Interval Top: | 7434 ft. | # Of Holes: | 80 | | Interval Bottom: | 7454 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 5/26/2020 Interval Top: 7196 ft. Interval Bottom: 7454 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 11/24/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/2/2010 | | Treatment Summary: | NB Perf 7196-7322 Holes 66 Size 0.38 CD Perf 7434-7454 Holes 80 Size 0.38
Frac Niobrara A & B & C down 4-1/2" Csg w/ 240,719 gal Slickwater w/ 200,520# 40/70 & 4,000# 20/40 SB Excel
No additional CD Frac treatment |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7405 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 4/5/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 5 | | BTU_GAS | 1297 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 6000 | | CALC_MCF_GAS | 30 | | CASING_PRESS | 587 | | GRAVITY_OIL | 49 | | MCF_GAS | 30 | | TUBING_PRESS | 521 |
| | Perforation Data: | | Interval Top: | 7196 ft. | # Of Holes: | 146 | | Interval Bottom: | 7454 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 1/26/2012 Interval Top: 7196 ft. Interval Bottom: 7322 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/24/2010 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/2/2010 | | Treatment Summary: | Frac Niobrara A & B & C down 4-1/2" Csg w/ 240,719 gal Slickwater w/ 200,520# 40/70 & 4,000# 20/40 SB Excel |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7196 ft. | # Of Holes: | 66 | | Interval Bottom: | 7322 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 05/26/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|