Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26258
Well Classification: OW Status: PA - 5/26/2020
Well Name/No:DOUTHIT #23-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date5/26/2020
FacilityID:292207LocationID:336167
Municipality/County:MEAD / WELD #123Location:SWSE 26 3N68W 6
Field:WATTENBERG - #90750Elevation:4918 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1200FSL  1543 FELLat/Long: 40.193060 / -104.966160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.193061 / -104.966144Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 5/26/2020             Measured TD: 7605 ft.    Vertical TD: 7431 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 5/26/2020
Wellbore PermitDIRECTIONAL
Permit #:20073905 Expiration Date:9/11/2008
Proposed Top PZ Location:Sec: Twp: Footage: 1330 FSL  2585 FWL
Bottom Hole Location:Sec:26 Twp: 3N 68W Footage: 1330 FSL  2585 FWL
Proposed Depth/Form:7558 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-67 , Unit Acreage: 160, Drill Unit: GWA

Wellbore Completed
Completion Date:11/12/2007
Spud Date:11/6/2007Spud Date Is:ACTUAL
Measured TD:7605 ft.Measured PB depth:7559 ft.
True Vertical TD:7431 ft.True Vertical PB depth:7385 ft.
Top PZ Location:Sec:26 Twp: 3N 68WFootage: 1327 FSL  2552 FWL
Bottom Hole Location:Sec:26 Twp: 3N 68WFootage: 1327 FSL  2552 FWL
Log Types:CBL, P/E AILC-CNLD-ML
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 779 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 0 ft., Bottom: 779 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7582 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 457, Top: 3850 ft., Bottom: 7582 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3792 ft.NN
SUSSEX4212 ft.NN
SHANNON4762 ft.NN
NIOBRARA7150 ft.NN
FORT HAYS7412 ft.NN
CODELL7434 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 4/7/2011                  Interval Top: 7434 ft.    Interval Bottom: 7454 ft.

 Completed Information for Formation CODELL
1st Production Date:4/9/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/24/2010
Treatment Summary:10/19/10 Set CIBP @ 7400' w/ sand cap for NB Recomplete 11/15/10 Drill and clean thru sand and CIBP to PB @ 7540 11/24/10 Commingle with NBRR production
Formation Treatment
Treatment Date:2/1/2008
Treatment Summary:189,000 GALS FLUID & 155,000# 40/70 SAND & 4000# 20/40 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1309
CALC_BBLS_H2O 0
CALC_BBLS_OIL 110
CALC_GOR 850
CALC_MCF_GAS 93
CASING_PRESS 1491
GRAVITY_OIL 52
TUBING_PRESS 1041
Perforation Data:
Interval Top:7434 ft.# Of Holes:80
Interval Bottom:7454 ft.Hole Size:0.38 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 5/26/2020                 Interval Top: 7196 ft.    Interval Bottom: 7454 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:11/24/2010Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/2/2010
Treatment Summary:NB Perf 7196-7322 Holes 66 Size 0.38 CD Perf 7434-7454 Holes 80 Size 0.38 Frac Niobrara A & B & C down 4-1/2" Csg w/ 240,719 gal Slickwater w/ 200,520# 40/70 & 4,000# 20/40 SB Excel No additional CD Frac treatment
Tubing Size:2.375 in.Tubing Setting Depth:7405 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/5/2011Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_OIL 5
BTU_GAS 1297
CALC_BBLS_OIL 5
CALC_GOR 6000
CALC_MCF_GAS 30
CASING_PRESS 587
GRAVITY_OIL 49
MCF_GAS 30
TUBING_PRESS 521
Perforation Data:
Interval Top:7196 ft.# Of Holes:146
Interval Bottom:7454 ft.Hole Size:0.38 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/26/2012                 Interval Top: 7196 ft.    Interval Bottom: 7322 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:11/24/2010Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/2/2010
Treatment Summary:Frac Niobrara A & B & C down 4-1/2" Csg w/ 240,719 gal Slickwater w/ 200,520# 40/70 & 4,000# 20/40 SB Excel
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7196 ft.# Of Holes:66
Interval Bottom:7322 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY05/26/2020
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No