|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 3/26/2024 Measured TD: 7986 ft. Vertical TD: 7922 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 3/26/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 11/28/2013 | | Proposed Top PZ Location: | Sec:6 Twp: 5N 67W | Footage: 668 FNL 1986 FEL | | Bottom Hole Location: | Sec:6 Twp: 5N 67W | Footage: 672 FNL 1993 FEL | | Proposed Depth/Form: | 7986 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: N2NE4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 814 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7973 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 985, Top: 1835 ft., Bottom: 7973 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/10/2007 | | Spud Date: | 11/3/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7986 ft. | Measured PB depth: | 7927 ft. | | True Vertical TD: | 7922 ft. | True Vertical PB depth: | 7863 ft. | | Top PZ Location: | Sec:6 Twp: 5N 67W | Footage: 668 FNL 1986 FEL | | Bottom Hole Location: | Sec:6 Twp: 5N 67W | Footage: 668 FNL 1986 FEL | | Log Types: | CBL, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 814 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 510, Top: 0 ft., Bottom: 814 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7973 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 985, Top: 1835 ft., Bottom: 7973 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3590 ft. | | N | N | | SUSSEX | 4212 ft. | | N | N | | SHANNON | 4681 ft. | | N | N | | NIOBRARA | 7018 ft. | | N | N | | FORT HAYS | 7310 ft. | | N | N | | CODELL | 7328 ft. | | N | N | | J SAND | 7793 ft. | | N | N |
Formation CODL Formation Classification: OW Status: CM - 11/4/2011 Interval Top: 7330 ft. Interval Bottom: 7350 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/14/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/19/2007 | | Treatment Summary: | FRAC W/169,644 GAL SLICK H2O & 115,600# 30/50 SD, TAILED W/4000# 20/40 SD EXCELL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7330 ft. | # Of Holes: | 60 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/26/2024 Interval Top: 7022 ft. Interval Bottom: 7350 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 1/14/2008 | Choke Size: | 0.406 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/10/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7295 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/25/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1326 | | CALC_BBLS_OIL | 43 | | CALC_GOR | 2697 | | CALC_MCF_GAS | 116 | | CASING_PRESS | 950 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 680 |
| | Perforation Data: | | Interval Top: | 7022 ft. | # Of Holes: | 183 | | Interval Bottom: | 7350 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/4/2011 Interval Top: 7022 ft. Interval Bottom: 7232 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/19/2007 | | Treatment Summary: | FRAC W/372,018 GAL OF SLICK H2O & 302,700# 30/50 SD, TAILED W/4000# 20/40 SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7022 ft. | # Of Holes: | 123 | | Interval Bottom: | 7232 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/26/2024 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|