|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/16/2018 Measured TD: 9322 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/16/2018 | | Wellbore Permit | DRIFTED | | Permit #: | 20090453 | Expiration Date: | 3/9/2010 | | Proposed Depth/Form: | 7633 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: UNSPACED , Unit Acreage: 80, Drill Unit: E2NW4 | | Formation And Spacing: | Code: FNTN , Formation: FOUNTAIN , Order: , Unit Acreage: 640, Drill Unit: ALL | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: UNSPACED , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: , Unit Acreage: 640, Drill Unit: ALL | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: UNSPACED , Unit Acreage: 80, Drill Unit: E2NW4 |
| | |
| Wellbore Completed | | Completion Date: | 5/14/2009 | | Spud Date: | 5/9/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 9322 ft. | Measured PB depth: | 5904 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, SD/DSN/AC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 806 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 334, Top: 0 ft., Bottom: 806 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 9278 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 6560 ft., Bottom: 9278 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5904 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 490, Top: 1900 ft., Bottom: 5920 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 6732 ft. | | N | N | | FORT HAYS | 7026 ft. | | N | N | | CODELL | 7049 ft. | | N | N | | GREENHORN | 7093 ft. | | N | N | | D SAND | 7468 ft. | | N | N | | MOWRY | 7515 ft. | | N | N | | J SAND | 7534 ft. | | N | N | | DAKOTA | 7784 ft. | | N | N | | MORRISON | 7912 ft. | | N | N | | LYONS | 8871 ft. | | N | N |
Formation LYNS Formation Classification: OW Status: AB - 7/16/2018 Interval Top: 8750 ft. Interval Bottom: 8810 ft.| Completed Information for Formation LYONS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | LYONS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation LYNS. |
| | Perforation Data: | | Interval Top: | 8750 ft. | # Of Holes: | 120 | | Interval Bottom: | 8810 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: GW Status: CM - 11/20/2009 Interval Top: 7052 ft. Interval Bottom: 7064 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 10/20/2009 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2009 | | Treatment Summary: | FRAC'D CODELL W/102,564 GALS OF SLICKWATER AND SILVERSTIM WITH 200,802#'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7052 ft. | # Of Holes: | 48 | | Interval Bottom: | 7064 ft. | Hole Size: | 0.41 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/16/2018 Interval Top: 6752 ft. Interval Bottom: 7064 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/14/2009 | | Treatment Summary: | COMMINGLE CODELL AND NIOBRARA. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7197 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/20/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 27 | | BBLS_OIL | 27 | | BTU_GAS | 1242 | | CALC_BBLS_H2O | 27 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 925 | | CALC_MCF_GAS | 25 | | CASING_PRESS | 165 | | GRAVITY_OIL | 56 | | MCF_GAS | 25 | | TUBING_PRESS | 150 |
| | Perforation Data: | | Interval Top: | 6752 ft. | # Of Holes: | 120 | | Interval Bottom: | 7064 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 11/20/2009 Interval Top: 6752 ft. Interval Bottom: 6958 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 10/20/2009 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/15/2009 | | Treatment Summary: | FRAC'D NIOBRARA W/279,174 GALS OF SLICK WATER AND SILVERSTIM WITH 404,143#'S OF OTTAWA SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6752 ft. | # Of Holes: | 72 | | Interval Bottom: | 6958 ft. | Hole Size: | 0.73 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/16/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|