Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26084
Well Classification: OW Status: PA - 8/29/2023
Well Name/No:FURROW - USX AB #15-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/29/2023
FacilityID:291612LocationID:310213
County:WELD #123Location:SWSW 15 7N64W 6
Field:WATTENBERG - #90750Elevation:4891 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:476FSL  462 FWLLat/Long: 40.567300 / -104.543310Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.567303 / -104.543318Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 8/29/2023             Measured TD: 7300 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 8/29/2023
Wellbore PermitDRIFTED
Permit #:20072945 Expiration Date:7/26/2008
Proposed Depth/Form:7350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 80, Drill Unit: W2SW4
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 80, Drill Unit: W2SW4

Wellbore Completed
Completion Date:8/7/2007
Spud Date:8/3/2007Spud Date Is:ACTUAL
Measured TD:7300 ft.Measured PB depth:7283 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CCL/CBL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 738 ft., Weight: NA , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 738 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7300 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 2018 ft., Bottom: 7300 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3528 ft.NN
SUSSEX4546 ft.NN
SHANNON5182 ft.NN
NIOBRARA6856 ft.NN
FORT HAYS7129 ft.NN
CODELL7152 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 2/1/2011                  Interval Top: 7155 ft.    Interval Bottom: 7165 ft.

 Completed Information for Formation CODELL
1st Production Date:10/30/2007Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/28/2007
Treatment Summary:FRACD W/ 128,751 GALS SIVLERSTIM W/ 28# GAL LOADING AND 270,080 # 20/40 OTTAWA SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7155 ft.# Of Holes:40
Interval Bottom:7165 ft.Hole Size:0.421875 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 8/29/2023                 Interval Top: 6858 ft.    Interval Bottom: 7165 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2007
Treatment Summary:COMMINGLED CODELL AND NIOBRARA. CODELL IS PRODUCING THROUGH A CAST IRON FRAC PLUG
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2007Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 38
BTU_GAS 1158
CALC_GOR 473
CASING_PRESS 600
GRAVITY_OIL 43
MCF_GAS 18
TUBING_PRESS 0
Perforation Data:
Interval Top:6858 ft.# Of Holes:168
Interval Bottom:7165 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 2/1/2011                  Interval Top: 6858 ft.    Interval Bottom: 6994 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/30/2007Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/7/2007
Treatment Summary:FRACD W/ 70,098 GALS SLICKWATER 98,844 GALS SIVERSTIM W/ 28# GEL LOADING AND 249,520# 30/50 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6858 ft.# Of Holes:128
Interval Bottom:6994 ft.Hole Size:0.421875 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/29/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No