|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/3/2022 Measured TD: 8110 ft. Vertical TD: 8019 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/3/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/27/2010 | | Proposed Top PZ Location: | Sec:36 Twp: 3N 66W | Footage: 69 FSL 2619 FWL | | Bottom Hole Location: | Sec:36 Twp: 3N 66W | Footage: 69 FSL 2619 FWL | | Proposed Depth/Form: | 8110 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 906 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 906 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8099 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 595, Top: 3634 ft., Bottom: 8099 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/2/2007 | | Spud Date: | 9/25/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 8110 ft. | Measured PB depth: | 8069 ft. | | True Vertical TD: | 8019 ft. | True Vertical PB depth: | 7978 ft. | | Top PZ Location: | Sec:36 Twp: 3N 66W | Footage: 69 FSL 2619 FWL | | Bottom Hole Location: | Sec:36 Twp: 3N 66W | Footage: 69 FSL 2619 FWL | | Log Types: | CBL, MUD, DIL/GL/GR, CNL/CNL/ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 906 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 480, Top: 0 ft., Bottom: 906 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8099 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 595, Top: 3680 ft., Bottom: 8099 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4140 ft. | | N | N | | SUSSEX | 4522 ft. | | N | N | | NIOBRARA | 7220 ft. | | N | N | | FORT HAYS | 7482 ft. | | N | N | | CODELL | 7504 ft. | | N | N | | J SAND | 7939 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/7/2022 Interval Top: 7942 ft. Interval Bottom: 7990 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 7/26/2010 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/9/2010 | | Treatment Summary: | FRAC JSND W/24,784 GAL LIGHTING N2 & 121,820# 20/40 SAND & 4,020# SB EXCEL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1329 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 21000 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 879 | | GRAVITY_OIL | 50 | | TUBING_PRESS | 419 |
| | Perforation Data: | | Interval Top: | 7942 ft. | # Of Holes: | 60 | | Interval Bottom: | 7990 ft. | Hole Size: | 0.41 in. |
|
Formation CODL Formation Classification: GW Status: CM - 8/3/2010 Interval Top: 7506 ft. Interval Bottom: 7522 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/14/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/30/2008 | | Treatment Summary: | 172,100 GALS FLUID & 4000# R/C SAND & 115,200# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7506 ft. | # Of Holes: | 64 | | Interval Bottom: | 7522 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/7/2022 Interval Top: 7226 ft. Interval Bottom: 7522 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 2/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/19/2010 | | Treatment Summary: | NBRR PERF 7226-7388 HOLES 109 SIZE 0.42 CODL PERF 7506-7522 HOLES 64 SIZE 0.42 NO ADDITIONAL TREATMENT. | | Formation Treatment | | Treatment Date: | 10/2/2007 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1329 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 16800 | | CALC_MCF_GAS | 84 | | CASING_PRESS | 879 | | GRAVITY_OIL | 50 | | TUBING_PRESS | 419 |
| | Perforation Data: | | Interval Top: | 7226 ft. | # Of Holes: | 173 | | Interval Bottom: | 7522 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 8/3/2010 Interval Top: 7226 ft. Interval Bottom: 7388 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 2/14/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/30/2008 | | Treatment Summary: | 1500 GAL ACID & 329,123 GALS FLUID & 8000# 20/40 R/C SAND & 253,180# 30/50 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7226 ft. | # Of Holes: | 109 | | Interval Bottom: | 7388 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 11/07/2022 |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 12/31/2030 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|