|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2024 Measured TD: 7703 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2024 | | Wellbore Permit | | | Permit #: | 20092562 | Expiration Date: | 8/31/2011 | | Proposed Depth/Form: | 7625 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 650 ft., Weight: 26 , Citings Type: PLANNED | | Cement: | Sacks: 466, Top: 0 ft., Bottom: 650 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7625 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1118, Top: 650 ft., Bottom: 7625 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/2/2010 | | Spud Date: | 10/30/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 7703 ft. | Measured PB depth: | 7654 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL, Triple Combo | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 747 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 293, Top: 0 ft., Bottom: 747 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7699 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 625, Top: 2020 ft., Bottom: 7699 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7183 ft. | | | | | FORT HAYS | 7500 ft. | | | | | CODELL | 7521 ft. | | | |
Formation NB-CD Formation Classification: OW Status: SI - 5/1/2024 Interval Top: 7206 ft. Interval Bottom: 7543 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 12/18/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/10/2010 | | Treatment Summary: | Codell & Niobrara are comingled; the Codell is producing through a composite flow through plug
Codell 7523'-7543', 80 holes, .41"
Frac'd Codell w/153052 gals Silverstim & 15% HCl with 269000 lbs Ottawa sand
Niobrara 7206'-7344' 48 holes, .73"
Frac'd Niobrara w/173750 gals Silverstim with 249880 lbs Ottawa sand |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/4/2011 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 28 | | BTU_GAS | 1326 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 28 | | CALC_GOR | 8893 | | CALC_MCF_GAS | 249 | | CASING_PRESS | 400 | | GRAVITY_OIL | 56 | | MCF_GAS | 249 |
| | Perforation Data: | | Interval Top: | 7206 ft. | # Of Holes: | 128 | | Interval Bottom: | 7543 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/31/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 08/27/2025 |
| Defined Inactive (SI ) | Y | Defined Inactive 04/30/2024 |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|